FY2022
ENGINEERING SERVICES The Engineering Division exists to provide the technical expertise for the design and construction management of the public infrastructure to enhance the quality of life of our residents. The Division also manages the public right-of-way to maintain the health, safety, and welfare of our community, and operates the storm water utility. The Engineering Division performs work in connection with all municipal public works improvements including bridges, roads, water mains, sanitary sewers, and storm water systems. Engineering staff review subdivision plans, design public works improvement projects, perform survey work, and inspect the construction of public works projects and subdivision improvements. Division staff also aid other departments in the design and construction of public improvement projects.
Engineering Division functions include:
• Right-of-Way Management • Capital Improvement Plan (CIP) Project Design • CIP Project Construction Administration and Inspection
• Subdivision and Site Plan Review and Inspection • Special Projects Administration and Inspection • Mapping of Streets and Public Utilities • Design and Construction Administration Assistance for Public Improvement Projects
HIGHLIGHTS
Recent Accomplishments: • Substantial completion of the Ped Mall Reconstruction Project • Substantial completion of the new Public Works Facility Phase I • Substantial completion of the Asphalt Resurfacing 2019 Project • Substantial completion of the Water Distribution East Pressure Zone Project • Substantial completion of the Lower Muscatine Area Storm Sewer Improvements Project • Substantial completion of the McCollister Boulevard Extension Project • Substantial completion of the Gilbert Street Intersection Improvements Project • Nearing completion of the Prentiss Street Bridge Project • Implemented electronic/online permitting process Upcoming Challenges: • Close out the Iowa City Gateway Project and the Ped Mall Reconstruction Project • Complete construction of the Asphalt Resurfacing 2020 Project • Complete design and construction of the Riverside Drive Pedestrian Tunnel Project • Construction of the Idyllwild Drainage Diversion Project
290
Made with FlippingBook flipbook maker