FY2022
Contact Jen Jordan Department PUBLIC WORKS
L3335
Project #
Project Name Landfill Dual Extraction System Expansion
Type One Phase
Useful Life 20 years
GRANTEE NONE
PLAN None
Category Landfill
MATCH % NONE
TIF DISTRICT None
Priority Efficiency Improvement (3)
Description This project includes the design and installation of an expansion of the Landfill Dual Extraction System, which was originally constructed in 2018. This project will expand the current system (13 pnuematic pumps and 4 solar pumps) to include pumps in 8-9 additional wells and add SCADA monitoring to the proposed new and existing pumps. Justification The expansion of the Landfill's Dual Extraction System will positively impact eight or nine more wells, which have liquid levels that are close to or exceed the screen within them. Having high liquid levels limits or prevents gas from being able to be pulled from those wells. Expansion of the Dual Extraction System will allow landfill operators to better control leachate and gas management onsite. This will enhance operator functionality and reduce manual labor time. Adding SCADA greatly improves monitoring capabilities and efficiencies for landfill staff. Total Project Cost: $600,000 Status Active
Expenditures
Total
2021
2022
2023
2024
2025
PLANNING/DESIGN CONSTRUCTION
55,000
55,000
485,000
485,000
INSPECTION
50,000
50,000
ADMINISTRATION
5,000
5,000
10,000
60,000
540,000
600,000
Total
Funding Sources LANDFILL FUND
Total
2021
2022
2023
2024
2025
60,000
540,000
600,000
60,000
540,000
600,000
Total
Budget Impact/Other Adding SCADA monitoring to the new and existing pumps will increase staff efficiency by allowing central monitoring., but but the annual savings are expected to be less than $10,000 per year.
547
Made with FlippingBook flipbook maker