Contact Jen Jordan Department PUBLIC WORKS

L3340

Project #

Project Name Bulk Water Fill Station

Type One Phase

Useful Life 15 years

GRANTEE NONE

PLAN None

Category Landfill

MATCH % NONE

TIF DISTRICT None

Priority Essential (2)

Description This project provides for the purchase and installation of a bulk water tank at the landfill. Total Project Cost: $175,000

Status Active

Justification The tank will help provide the needed volume to ensure the refresh rate of the planned water main and allow for efficient filling of the landfill's tank used for daily spray cover mixing. In the event of a fire it will also significantly reduce both transportation and fill time for the Fire Department.

Expenditures

Total

2021

2022

2023

2024

2025

PLANNING/DESIGN CONSTRUCTION

50,000

50,000

125,000

125,000

175,000

175,000

Total

Funding Sources LANDFILL FUND

Total

2021

2022

2023

2024

2025

175,000

175,000

175,000

175,000

Total

Budget Impact/Other Water costs and maintenance costs will be incurred based on water use. The estimated annual increase in operating expenditures is $10,000 to $15,000.

Contact Jen Jordan Department PUBLIC WORKS

L3341

Project #

Project Name Bulldozer upgrade

Type One Phase

Useful Life 15 years

GRANTEE NONE

PLAN None

Category Landfill

MATCH % NONE

TIF DISTRICT None

Priority Critical (1)

Description This project replaces the existing D7E Caterpillar bulldozer with a D8T Caterpillar bulldozer to improve safety and significantly improve operational efficiency and compaction due to height of the machine, the weight, effective dozing distance and blade capacity. With Equipment Replacement reserves and trade-in value, the finances are $425,000 short of the cost of the new machine. Justification This upgrade allows for safer and more efficient operations. The D7E sits low and regularly gets stuck; this reduces work time for both the D7E and the existing D8T to pull it out. A D8T is 25,000 pounds heavier, providing better compaction. The D7E has a shorter effective dozing distance; since long pushes are needed due to flat filloperations; this decreases efficiency significantly and increases the chances of material coming off the side of the blade. The D7E blade capacity is less than half of the D8T, causing at least twice as many pushes across the cell. Total Project Cost: $425,000 Status Active

Expenditures EQUIPMENT

Total

2021

2022

2023

2024

2025

425,000

425,000

425,000

425,000

Total

Prior

Funding Sources LANDFILL FUND

Total

2021

2022

2023

2024

2025

250,000

175,000

175,000

175,000

175,000

Total

Total

Budget Impact/Other The increased size of the bulldozer will be more expensive to operate and the replacement costs will increase. The estimated increase in operating expenditures is $50,000 per year.