FY2022
Contact Tim Wilkey Department PUBLIC WORKS
V3169
Project #
Project Name Napoleon Lift Station Improvements
Type One Phase
Useful Life 20 years
GRANTEE NONE
PLAN None
Category Wastewater Treatment
MATCH % NONE
TIF DISTRICT None
Priority Critical (1)
Description Rehabilitate selected equipment at the Napoleon Lift Station including the bar screen crawler assemblies with drive unit, the air handling system and rebuilding of the NPPS Pumps #1 and #6 pumping assembly’s and replacing associated electrical or mechanical appurtenances as necessary. Justification Napoleon lift station was constructed in 2000 and is the primary lift station for approximately 2/3 of the wastewater flow to the WWTP. The Bar screen crawler, pumps #1 and #6 and air handling system have operated consistently since its coming into operations and show wear and tear consistent with 20 years of operations and are nearing the end of their useful design life. Improvements in crawler and pump design will offer operation and efficiency improvements. Napoleon Lift Station is the City's primary lift station conveying 2/3 of the daily total flow to the WWTP. If any of this equipment were to fail it would limit the operation of the lift station until repairs could be made. Total Project Cost: $800,000 Status Active
Expenditures
Total
2021
2022
2023
2024
2025
PLANNING/DESIGN CONSTRUCTION
10,000
10,000
726,000
726,000
INSPECTION
2,000
2,000
ADMINISTRATION CONTINGENCY
2,000
2,000
60,000
60,000
800,000
800,000
Total
Funding Sources WASTEWATER FUND
Total
2021
2022
2023
2024
2025
800,000
800,000
800,000
800,000
Total
Budget Impact/Other These projects should lower operating expenditures through the replacement of aging infrastructure. The estimated annual savings is less than $10,000 per year.