FY2022

Contact Tim Wilkey Department PUBLIC WORKS

V3171

Project #

Project Name Replace Sludge Recirculation Pumps

Type One Phase

Useful Life 20 years

GRANTEE NONE

PLAN None

Category Wastewater Treatment

MATCH % NONE

TIF DISTRICT None

Priority Essential (2)

Description Replace sludge recirculation pumps 8811A, 8812A and 8813A, including any piping modifications and electrical upgrades. Total Project Cost: $250,000

Status Active

Justification The pumps referenced above have been in place since 1988 and are beyond their useful design life. Repairs to these pumps have been increasing the past 5 years. Planned replacement is more cost effective than an emergency replacement. Recirculation of digesters 8601, 8701 and 8801 is critical to their operation. If recirculation were lost due to catastrophic failure, it would impede the operation of the digester complex.

Expenditures

Total

2021

2022

2023

2024

2025

PLANNING/DESIGN CONSTRUCTION

2,000

2,000

221,000

221,000

INSPECTION

1,000

1,000

ADMINISTRATION CONTINGENCY

1,000

1,000

25,000

25,000

250,000

250,000

Total

Funding Sources WASTEWATER FUND

Total

2021

2022

2023

2024

2025

250,000

250,000

250,000

250,000

Total

Budget Impact/Other These projects should lower operating expenditures through the replacement of aging infrastructure. The estimated annual savings is less than $10,000 per year.