Contact Tim Wilkey Department PUBLIC WORKS
V3174
Project #
Project Name Aeration Equipment Improvements
Type One Phase
Useful Life 20 years
GRANTEE NONE
PLAN None
Category Wastewater Treatment
MATCH % NONE
TIF DISTRICT None
Priority Efficiency Improvement (3)
Total Project Cost: $1,000,000
Description Replace Lamson 300 HP Centrifigul Blower with a High Speed Turbo Blower.
Status Active
Justification The existing Lamson Blowers were placed in service in 2002 as part of the first iteration of the activated sludge process units. The blower is a "starts across the line", meaning that it is either on or off and cannot be regulated with Variable frequency drives. Because of this and its HP capacity, it has high starting amps that affect our electrical peak loading billing with REC. The New High Speed turbo blower uses a VFD which eliminates the inrush of power, allowing us to regulate our peak loading.
Expenditures
Total
2021
2022
2023
2024
2025
PLANNING/DESIGN CONSTRUCTION
10,000
10,000
891,000
891,000
INSPECTION
5,000
5,000
ADMINISTRATION CONTINGENCY
5,000
5,000
89,000
89,000
1,000,000
1,000,000
Total
Funding Sources WASTEWATER FUND
Total
2021
2022
2023
2024
2025
1,000,000
1,000,000
1,000,000
1,000,000
Total
Budget Impact/Other By replacing the Lamson blower with a high speed turbo blower, we anticipate a 10% reduction in power cost for the foreseeable future. The estimated annual savings is less than $10,000 per year.