Contact Kevin Slutts Department PUBLIC WORKS

W3323

Project #

Project Name Water Distribution Asset Inventory

Type One Phase

Useful Life 10 years

GRANTEE NONE

PLAN None

Category Water Operations

MATCH % NONE

TIF DISTRICT None

Priority Essential (2)

Description Locate with survey grade accuracy all hydrants, valves, tanks, and other above ground accessible water distribution appertenances and deliver in a geographic information system geometric network with associated metadata for asset management functions. Justification Asset management requires an accurate asset inventory to reliably know the number, location, and information regarding above and below ground assets. The budget provided is based on an $18 per structure cost with about 10,000 structures (hydrants, valves, etc.). Total Project Cost: $250,000 Status Active

Expenditures

Total

2021

2022

2023

2024

2025

PLANNING/DESIGN CONSTRUCTION

20,000

20,000

230,000

230,000

250,000

250,000

Total

Funding Sources

Total

2021

2022

2023

2024

2025

WATER FUND

250,000

250,000

250,000

250,000

Total

Budget Impact/Other This project will have a negligible impact on the operating budget.

Contact Darian Nagle-Gamm Department TRANSPORTATION SERVIC

T3020

Project #

Project Name Replacement of Electronics in Smart Parking Meters

Type One Phase

Useful Life 10 years

GRANTEE NONE

PLAN None

Category Parking Operations

MATCH % NONE

TIF DISTRICT None

Priority Critical (1)

Description This project involves the replacement of the electronics in our on-street parking meters. Total Project Cost: $200,000

Status Active

Justification The electonic equipment in our 1,200 smart parking meters are reaching the end of their useful life. The modems inside each meter will need upgraded before spring 2021 due to the discontinued support of 3G technology. This project will replace the internal meter compont while maintaining the current meter housing to reduce the overall project cost. If no action is taken, the on-street meters will no longer accept credit card payments or provide back-end reporting.

Expenditures EQUIPMENT

Total

2021

2022

2023

2024

2025

200,000

200,000

200,000

200,000

Total

Funding Sources PARKING FUND

Total

2021

2022

2023

2024

2025

200,000

200,000

200,000

200,000

Total

Budget Impact/Other The operating impact of this change should be negligible. Operating costs should be reduced slightly due to the replacement of old equipment with new equipment. The savings should be less than $10,000 per year.

603