FY2022

City of Iowa City Capital Improvement Program Unfunded Projects

Project Name

Description

Unfunded Amt

32 KIMBALL ROAD

Reconstruct Kimball road from N. Gilbert Street to N. Governor Street. Project includes 22 foot wide PCC street and a 5 foot wide sidewalk on one side of the street, new 8" DIP water main, new storm sewer, and sanitary service improvements. Landscaping and aesthetic treatments in the Interstate 80 corridor. The objective of this project is to mitigate the visual impact of the addition of a third lane to I-80 and to provide cohesive and pleasing feel to the Iowa City corridor. A private street that the property owners would dedicate the right of way to the City, and the City will reconstruct. Parking along and adjacent to the right of way will be reconfigured to better facilitate vehicle movement and pedestrian safety. Obtain consulting services to provide a functional design of Gilbert Street between Hwy 6 & Kirkwood Avenue. The functional design should take into account all previous design work completed for the corridor. Preparation of Old Rock Island Railroad Depot for Amtrak service, including platform construction, lighting, utilities, passenger information display, ticketing kiosks, canopy, warming shelter, signage, parking, and accessibility improvements. To construct façade improvements on the Capitol Street and Dubuque Street parking ramps to improve their aesthetic appearance in these high profile, high traffic areas. This project will extend the Iowa River Trail from just north of Highway 6 to Sturgis Ferry Park on the west side of the Iowa River. Construction of a trail extension adjacent to (east) of the Iowa River between Park Road and the University of Iowa pedestrian bridge. The project includes the extension of a 10' wide trail along north Branch of Snyder Creek from Scott Boulevard to American Legion Road. This project will construct an 8' wide sidewalk adjacent to Old Highway 218 between Sturgis Ferry Park and McCollister Boulevard. The project removes the existing Crandic tracks and repurposes the existing corridor for a 10' multi-use trail approximately between Oakdale Boulevard in Coralville to Gilbert Street in Iowa City (approximately 6.1 miles). Iowa City's portion of the project is approximately 1.75 miles.

$3,480,000

RECONSTRUCTION

33 INTERSTATE 80 AESTHETIC IMPROVEMENTS

$300,000

34 TOWNCREST DRIVE RECONSTRUCTION

$600,000

35 GILBERT STREET FUNCTIONAL DESIGN - HWY 6 TO KIRKWOOD

$60,000

3 - Transportation Services 36 ROCK ISLAND RAILROAD DEPOT RESTORATION

$5,381,000

37 CAPITOL & DUBUQUE STREET PARKING RAMP FAÇADE IMPROVEMENTS 4 - Ped & Bike Trails 38 IOWA RIVER TRAIL, HIGHWAY 6 TO STURGIS FERRY PARK 39 IOWA RIVER TRAIL, GATEWAY SEGMENT

$1,000,000

$1,180,000

$500,000

40 WINDSOR RIDGE TRAIL EXTENSION

$1,200,000

41 OLD HIGHWAY 218 TRAIL/WIDE SIDEWALK 42 CRANDIC RAILROAD RAILS-TO- TRAILS PROJECT

$550,000

$1,575,000

43 MYRTLE AVE SIDEWALK INFILL The project will construct sidewalk along the north side of Myrtle Avenue between Greenwood Drive and Olive in order to fill in a gap in the City’s sidewalk network.

$155,000

44 SOUTHGATE AVE IOWA RIVER TRAIL CONNECTOR

This project will construct a trail connection along Southgate Avenue from Gilbert Street to the Iowa River Trail.

$250,000

611

Made with FlippingBook flipbook maker