FY2023 Adopted Budget

PUBLIC WORKS

Department

V3170

Project #

Tim Wilkey

Contact

Project Name WWTP Roof Replacements

Multi-Phase

Type

25 years

Useful Life

GRANTEE NONE

PLAN None

Wastewater Treatment

Category

MATCH % NONE

TIF DISTRICT None

Critical (1)

Priority

Total Project Cost: $1,200,000

Description Replace roofs on buildings at wastewater treatment plant.

Active

Status

Justification City staff has identified various plant building roofs as being deficient. The bulk of these buildings are part of the original WWTP project from 1988 with the others from the 2000 project. They have outlived any warranty’s given at the time of construction and are in need of replacement. These roof's cover multiple buildings with critical infrastructure in them. Should any building suffer water damage that impedes the division staff from performing their job function or causes equipment failure, that could cause the WWTP to not meet its NPDES permit required discharge limits and put the City in environmental liability.

Future

Expenditures

Total

2022

2023

2024

2025

2026

300,000

PLANNING/DESIGN

20,000

20,000

20,000

60,000

CONSTRUCTION

250,000

250,000

250,000

750,000

Total

INSPECTION

5,000

5,000

5,000

15,000

ADMINISTRATION

5,000

5,000

5,000

15,000

CONTINGENCY

20,000

20,000

20,000

60,000

300,000

300,000

300,000

900,000

Total

Future

Funding Sources

Total

2022

2023

2024

2025

2026

300,000

WASTEWATER FUND

300,000

300,000

300,000

900,000

300,000

300,000

300,000

900,000

Total

Total

Budget Impact/Other These projects should lower operating expenditures through the replacement of aging infrastructure. The estimated annual savings is less than $10,000 per year.