FY2024 Proposed Budget
Goals, objectives, and performance measures
Demonstrate Leadership in Climate Action and Invest in Public Infrastructure, Facilities and Fiscal Reserves Foster and improve healthy sustainable municipally owned buildings, with a focus on energy savings, healthier environments and best life cycle costs. Decrease the City's carbon emissions, energy and water use in public buildings and infrastructures. To better monitor and improve existing systems in Heating, Ventilation and Air Conditioning (HVAC), Building Envelopes, Building Automation Systems (BAS), including LED lighting replacement and water reduction and savings projects.
Strategic Plan Goals:
Department Goal:
Department Objective:
Performance Measures: Annual Sustainability Improvements in energy, water and carbon emissions
FY 2023 Projected
FY 2023 Projected
FY 2020
FY 2021
FY 2022
Project:
RALRC HVAC/BAS Project
City Hall Boiler/BAS Project
Mercer Natatoriu m LED Lighting Project 14,085**
Mercer Dehumidification Project
Fairmeadows/ Wetherby Splashpad
Annual kWh electrical savings Annual Therms savings Annual energy savings in dollars Energy Incentive Rebate
26,471
51,994
Pending Pending
Pending Pending
3,966
5,666
n/a
$3,678
$5,613
$4,499**
Pending
Pending
$17,339
$11,905
n/a
Pending
Pending
*Electricity rebate only/transfer gas does not qualify for natural gas savings.
**When calculating lifecycle cost, actual calculations are closer to 40% to 50% in actual energy savings and lamp replacement costs (due to less landfill waste of material); further, these calculations do not include savings of staff time in bulb replacement.
158
Made with FlippingBook Learn more on our blog