FY2024 Proposed Budget
Recent Accomplishments: Cleaning two alluvial wells which included the removal of approximately 135 tons of sand. Connected the Peninsula Well Field to a more resilient power feed with a manual bus transfer switch for an alternative circuit. Implemented a more efficient utility locate process. Restarted the utility bill collection process. Assisted in the inspection and testing of multiple water main installations. Successfully adapted to new CDL testing requirements.
Upcoming Challenges:
Upgrade of one alluvial well. Upgrade of chlorine disinfection system. Coating and preserving multiple outdoor electrical components.
Continuing to record private service line information for lead and copper rule revisions. Participate in the EPA UCMR5 from 2023-2025 to develop a nationwide database of PFAS and lithium contamination in fresh waters. Complete and integrate new survey-grade asset inventory information into ArcGIS. Continue to train new personnel and promote professional certifications.
240
Made with FlippingBook Learn more on our blog