FY2024 Proposed Budget

Recent Accomplishments:  Cleaning two alluvial wells which included the removal of approximately 135 tons of sand.  Connected the Peninsula Well Field to a more resilient power feed with a manual bus transfer switch for an alternative circuit.  Implemented a more efficient utility locate process.  Restarted the utility bill collection process.  Assisted in the inspection and testing of multiple water main installations.  Successfully adapted to new CDL testing requirements.

Upcoming Challenges:

 Upgrade of one alluvial well.  Upgrade of chlorine disinfection system.  Coating and preserving multiple outdoor electrical components.

 Continuing to record private service line information for lead and copper rule revisions.  Participate in the EPA UCMR5 from 2023-2025 to develop a nationwide database of PFAS and lithium contamination in fresh waters.  Complete and integrate new survey-grade asset inventory information into ArcGIS.  Continue to train new personnel and promote professional certifications.

240

Made with FlippingBook Learn more on our blog