FY2024 Proposed Budget
Capital Improvement Plan 2023-2027 City of Iowa City, Iowa
2023 2027 thru
Department PUBLIC WORKS
Contact Ben Clark
Type One Phase
M3635
Project #
Useful Life 50 years
Project Name River Street Storm Sewer Improvements
Priority Essential (2) Category Stormwater
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Status Active
Description This project will install storm sewer pipe in an open ditch along the west side of River Street, north of the lower Lincoln School parking lot. A five-foot-wide compliant sidewalk will replace the existing walk. Total Project Cost: $990,000
Justification The existing open channel storm water drainage ditch is deteriorating and is susceptible to blockage from debris. Utility services have been exposed to the surface due to erosion along the bottom of the ditch. Further erosion will potentially impact the sidewalk and street. A compliant sidewalk will facilitate pedestrian traffic to the school.
Expenditures
Total
2023
2024
2025
2026
2027
90,000 50,000
90,000 50,000 700,000 60,000 30,000 60,000 990,000
PLANNING/DESIGN
LAND/ROW ACQUISITION
700,000 60,000 30,000 60,000 850,000
CONSTRUCTION
INSPECTION
ADMINISTRATION CONTINGENCY
140,000
Total
Funding Sources STORMWATER FUND
Total
2023
2024
2025
2026
2027
140,000 140,000
850,000 850,000
990,000 990,000
Total
Budget Impact/Other There is no anticipated impact to operating budget.