FY2024 Proposed Budget
Capital Improvement Plan 2023-2027 City of Iowa City, Iowa
2023 2027 thru
Department PUBLIC WORKS
Contact Tim Wilkey
Type Multi-Phase
V3164
Project #
Useful Life 20 years
Project Name Return Activated Sludge Pump Replacement
Category Wastewater Treatment
Priority Essential (2)
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Status Active
Description The project would include the replacement of return activaterd sludge pumps (RAS) 7121A, 7122A, 7123A, 5301A and 5401A along with associated equipment. This includes all pumps, valves, sludge and any piping/structural modifications required to fit the pumps. Total Project Cost: $1,313,500
Justification These pumps and valves have been in service since 2002 and are nearing the end of their useful working life. The maintenance repair frequency for these pumps has been increasing in the past year. Failure to replace these pumps in a timely manner could cause diminished operation and treatment of the wastewater resulting in violations of our NPDES discharge permit.
Expenditures
Total
2023
2024
2025
2026
2027
105,000
105,000
PLANNING/DESIGN CONSTRUCTION
1,070,000
1,070,000
21,000 10,500 107,000
21,000 10,500 107,000
INSPECTION
ADMINISTRATION CONTINGENCY
105,000
1,208,500
1,313,500
Total
Funding Sources WASTEWATER FUND
Total
2023
2024
2025
2026
2027
105,000 105,000
1,208,500 1,208,500
1,313,500 1,313,500
Total
Budget Impact/Other New pumps and associated equipment would increase pump efficiency, and lower energy consumption and maintenance costs. The estimated reduction in operating expenditures is less than $10,000 per year.
618