FY2024 Proposed Budget
Capital Improvement Plan 2023-2027 City of Iowa City, Iowa
2023 2027 thru
Department PUBLIC WORKS
Contact Tim Wilkey
Type One Phase
V3177
Project #
Useful Life 25 years
Project Name HVAC Replacement
Category Wastewater Treatment
Priority Essential (2)
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Status Active
Description Replace the heating/ventilation/air conditioning (HVAC) for the Influent Pump Station (IPS), Sludge Processing Building (SSPRS), Motor Vehicle Storage Building (MVSB), Administration Building (ADMIN), and Grit Building (GRIT) Total Project Cost: $743,000
Justification The HVAC systems for the buildings listed above are all original to them. They age from 20 to 35 years old and have had significant repair work in the past 5 years but that has not extended the useful life of these systems. Due to the nature of the facility, building ventilation is critical to the work that is being performed and provides a safe work environment for the employees.
Expenditures
Total
2023
2024
2025
2026
2027
60,000
60,000 600,000 15,000 60,000 743,000 8,000
PLANNING/DESIGN CONSTRUCTION
300,000
300,000
7,500 4,000
7,500 4,000
INSPECTION
ADMINISTRATION CONTINGENCY
30,000 341,500
30,000 341,500
60,000
Total
Funding Sources WASTEWATER FUND
Total
2023
2024
2025
2026
2027
60,000 60,000
341,500 341,500
341,500 341,500
743,000 743,000
Total
Budget Impact/Other The estimated impact on the operating budget is less than $10,000.
624
Made with FlippingBook Learn more on our blog