City of Iowa City Capital Improvement Program Unfunded Projects
Project Name
Description
Unfunded Amt
$195,500
81 Lee/Highwood Street Water Main Replacement
This is a water main replacement project with respective street and sidewalk replacement at Lee Street and Highwood Street. Approximately 550 feet of 6" cast-iron pipe (vintage 1951) will be replaced with 6" PVC pipe. Approximately 300 feet of PVC will be installed where no pipe has existed previously. Approximately 500 feet of 6-inch cast-iron pipe (vintage 1958) will be replaced with 500 feet of 8-inch PVC on the 900 block of Deforest Avenue. This is a water main replacement project with respective street and sidewalk replacement. Approximately 620 feet of 6-inch cast-iron pipe (vintage 1953) will be replaced with 8" PVC. This is a water main replacement project with respective street and sidewalk replacement. Approximately 650 feet of 6-inch cast-iron pipe (vintage 1974) will be replaced with 8" PVC. Automate manual operating procedures, motorize concentrator adjustment and motorized valve adjustor for the small influent valve. This project will be informed by the Replace the roofs on the 5 collector wells, 3 deep wells, and emergency generator building. Modify the lagoon outlet structure to an open channel design. This project will be informed by the Treatment Extend 20-inch water main from Madison to Clinton on Market St. Tie in 12-inch on Clinton St. to 16-inch at Bloomington St. This project will be preceded by the abandonment of the 20-inch main along the old Davenport St right-of-way between dormitories. Decommission the Bloomington ground storage reservoir within the University of Iowa Campus Parking Ramp and return the space to the University of Iowa per the associated 28E agreement. The 28E agreement expires on December 31, 2038. (Resolution No. 88-176) Remove the existing soda ash and ammonia chemical feed systems. Replace the existing powdered soda ash feed system with a liquid soda ash feed. The use of soda ash is to increase alkalinity of the source water for lime softening purposes. This is necessary if drawing from the river. This project will be informed by the Nutrient Study. Clean and inspect the laterals of the Sand Pit Pumping Station. Replace and repair the lateral isolation valves and operators. Construct a two million gallon ground or elevated storage reservoir within the East Pressure Zone. Replace the two million gallon ground storage reservoir located on Sycamore Street with a ground or elevated two million gallon storage tank along McCollister Blvd. Upgrade or expand the buildings at the Emerald and Rochester ground storage reservoirs. Add a third pump to both ground storage reservoirs. Replace the backup generators at both ground storage reservoirs.
$350,000
82 Deforest Ave Water Main Replacement 83 Giblin Drive Water Main Replacement
$246,350
$340,000
84 Sixth Avenue Water Main Replacement
$75,000
85 Water Plant Softener Improvements
86 Well House & Generator Building Roof Replacement 87 Lime Lagoon Outlet Structure Modifications 88 Market Street Water Main - Madison To Clinton
$500,000
$500,000
$1,400,000
$
250,000
89 Bloomington Gsr Decommissioning
$
1,000,000
90 Soda Ash Replacement
$
250,000
91 Sand Pit Pumping Station Rehabilitation
92 East Side Water Tower
$
4,000,000
$
4,000,000
93 Sycamore Gsr Replacement
$
1,500,000
94 Emerald And Rochester Gsr Improvements
658