FY25 Proposed Budget
Department
Project # Priority
Total
2024
2025 2026 2027 2028
PUBLIC WORKS
Annual Stormwater Improvements Annual Traffic Signal Projects
2 2 2 2 2 2 2 2 2
240,000 200,000 45,000 100,000 188,082 50,000 400,000 500,000
240,000 300,000 50,000 100,000
240,000 300,000 50,000 100,000 217,700 50,000 300,000 500,000
240,000 300,000 50,000 100,000 217,700 50,000 300,000 750,000
240,000 300,000 50,000 100,000 217,700 50,000 300,000 750,000
M3631 S3814 S3816 S3822 S3824 S3826 S3827 S3910 V3101
1,200,000 1,400,000
Traffic Calming Curb Ramps-ADA
245,000 500,000
Annual Pavement Rehabilitation Underground Electrical Facilities Bicycle Master Plan Implementation Annual Bridge Maintenance & Repair Annual Sewer Main Replacement
2,125,388 2,145,100 2,345,100 2,345,100 2,345,100
11,305,788 1,058,882
217,700
200,000
300,000 500,000
1,600,000 3,000,000
20,509,670
3,848,470 3,852,800 4,102,800 4,352,800 4,352,800
PUBLIC WORKS Total
This is an annual project that will repair and/or improve storm water infrastructure throughout the City. M3631 Annual Stormwater Improvements
This is an annual project to replace or add traffic signals at intersections with outdated traffic signal equipment or at dangerous and uncontrolled intersections. S3814 Annual Traffic Signal Projects
Annual appropriation for traffic calming projects S3816 Traffic Calming
Annual appropriation for the construction of ADA accessible curb ramps. S3822 Curb Ramps-ADA
Annual appropriation for resurfacing roadways and alleys including asphalt, concrete, and brick. S3824 Annual Pavement Rehabilitation
This is an annual project to convert overhead electrical systems to underground. Dubuque Street, Riverside Drive, and Gilbert Street are currently the priority corridors for undergrounding electrical facilities. S3826 Underground Electrical Facilities
S3827 Bicycle Master Plan Implementation
This is an annual project to implement the recommendations of the bicycle master plan. Improvement projects include construction of bike lanes, bike boulevards, and other features that will improve streets to promote equal access and usability for all modes of transportation. Projects also fund the conversion of 4-lane roads into 3-lane roads in certain areas that are highly used by all of the various modes of transportation. Projects are scheduled as follows: 2023 - Sunset Bike Lanes (Benton to Highway 1); Oakcrest Bike Blvd; Emerald Bike Blvd; Arlington Bicycle Blvd; 2024 - Dover /Westminster Bike Blvd; Highland Bicycle Blvd; 2025 - Church Street Bicycle Blvd; Broadway Bike Lanes (Sandusky to Highway 6); Ridge/Broadway Bike Blvd; 2026 - Washington Street Bike Blvd (Scott Blvd to 1st Avenue); River Bike Blvd; Woolf Bike Blvd; Newton Marked Route This provides for the biennial inspection and preservation of Iowa City's bridges including major repairs and restoration. S3910 Annual Bridge Maintenance & Repair This project consists of annual sanitary sewer repairs and preventive maintenance throughout the sewer system. Work include sewer lining, spot repairs and manhole lining and replacement. V3101 Annual Sewer Main Replacement