FY25 Proposed Budget
2024 2028 thru
Capital Improvement Plan 2024-2028 City of Iowa City, Iowa
PUBLIC WORKS
Department
Contact Ben Clark
One Phase
Type
M3635
Project #
50 years
Useful Life
Project Name River Street Storm Sewer Improvements
Stormwater
Category
GRANTEE NONE
PLAN None
Essential (2)
Priority
MATCH % NONE
TIF DISTRICT None
Active
Status
Total Project Cost: $990,000
Description This project will install storm sewer pipe in an open ditch along the west side of River Street, north of the lower Lincoln School parking lot. A five-foot-wide compliant sidewalk will replace the existing walk.
Justification The existing open channel storm water drainage ditch is deteriorating and is susceptible to blockage from debris. Utility services have been exposed to the surface due to erosion along the bottom of the ditch. Further erosion will potentially impact the sidewalk and street. A compliant sidewalk will facilitate pedestrian traffic to the school.
Expenditures
Total
2024
2025
2026
2027
2028
PLANNING/DESIGN
90,000
90,000
LAND/ROW ACQUISITION
50,000
50,000
CONSTRUCTION
700,000
700,000
INSPECTION
60,000
60,000
ADMINISTRATION
30,000
30,000
CONTINGENCY
60,000
60,000
140,000
850,000
990,000
Total
Funding Sources
Total
2024
2025
2026
2027
2028
STORMWATER FUND
140,000
850,000
990,000
140,000
850,000
990,000
Total
Budget Impact/Other There is no anticipated impact to operating budget.