FY25 Proposed Budget
City of Iowa City Capital Improvement Program Unfunded Projects
Project Name
Description
Unfunded Amt
73 Hawkeye Lift Station
Rehabilitation includes demolishing the existing building, converting the station to a wet-well valve vault with surface hatches for pump access, basket screening, new standby generator, replace 20 year old pump, new controls, valve vault with bypass capacity, new security fence, landscaping and access road improvements. The station would be plumbed for future expansion, but would not include additional Replace RDT 1 and 2 with in-kind process equipment or a more efficient process equipment. This will include all ancillary equipment required to make this an operational and a direct replacement for the existing RDTs 1 and 2 and all of their ancillary equipment. The project includes the replacement of the control panel and aquisistion of a redundent pump. Build a 40' x 60' structure over Ultra Violet disifection structure for protection and for storage of the UV bank modules during the off season. Project will include buildng heat and electical supply. Install a fourth Effluent Water Pump to serve the in plant distribution system and soccer park irrigation system. Work includes rebuilding of the Amiad filtration system. Build a 40' x 60' structure over Ultra Violet disifection structure for protection and for storage of the UV bank modules during the off season. Project will include buildng heat and electical supply. Funds requested below are for design with construction to follow in 2029.
$1,645,000
74 Rotating Drum Thickener Replacement 1 & 2
$1,662,000
75 Peninsula Control Panel and Pump Improvement
$130,000
76 UV Building and Storage
$1,000,000
77 Effluent Water Pump Station Improvements
$76,000
77 UV Building and Storage
$100,000
78 Wastewater Division Master Plan Perform a master plan for the Wastewater Division looking forward for the next 20 years. The study will include the wastewater treatment plant, all sanitary lift stations, and the sanitary sewer collection system.
$299,000
6 - Water
79 West Side Ground Storage Reservoir
Construction of a two million gallon ground or elevated storage reservoir with associated pumping station and generator west of US-218. Current land acquired for this reservoir is southeast of the Slothower Rd at Hebl Ave This project will be for the reduction of dissolved nutrients (i.e. nitrates) in the source water. The project is preceded by a study. The study will review treatment technology options (i.e. reverse osmosis, biological treatment) and the long-term viability of continued lime softening.
$15,000,000
80 Nutrient Removal Project
$4,000,000
81 Collector Well #1 Rehabilitation Clean two of the existing laterals and cap one existing lateral of Collector Well #1. Install two new 12-inch laterals to increase the production capacity of this raw water well.
$3,000,000
82 Water Treatment Plant Filter #6 Buildout
Add underdrains, granular media, controls, and instrumentation to filter bay #6. This bay was left unfinished to allow for future expanded production. The project will also repair or replace a number of filter control valves. The project will be informed by the Treatment Study.
$1,500,000