FY26 Proposed Budget
Recent Accomplishments: Hired and trained (7) staff in FY24 Completing a 3-year implementation of Cartegraph for asset management Utilizing Tyler Notify, SSRS reports, and other means to bring the month-to-month average of non-functioning water meters from (600) to (100). Update of the Chlorine feed equipment Successful implementation of Granular Activated Carbon removal and replacement procedures for a 50% reduction in overtime hours during the annual project Completing the replacement of 16-inch water main along Highway 6. Implementation of a Lead Reduction Program to provide information and resources to residents to remove or reduce lead exposures in drinking water Conducted excavation safety and rescue training alongside the Fire Department Completed the replacement of water main with water staff at the end of Indigo Ct Installed City fiber optic cable to the Peninsula Well Field Upcoming Challenges: Continued increases in operational costs due to components reaching design end-of lift coupled with inflationary costs on goods, services, and internal services. Continued training of new staff members to ensure proper operation and maintenance of the drinking water treatment and distribution systems are sustained. Work schedules requiring on-call, nights, and weekends perceived to be unsatisfactory by prospective candidates and current employees. Public notice of lead service lines and lead service unknown material types. Maintaining sufficient meter inventory to keep up with design end-of-life water meter failures. Replacement of water main on Bradford Dr, Wayne Ave, and Louise St. Replacement of variable frequency drives for the high service pumps. Design efforts for the rehabilitation of collector well #1. Rehabilitation of the Powerhouse Dam Completion of the Storage, Treatment, and Source Water studies. Beginning a water rate study to explore how to accomplish approximately $50M worth of improvements in the next 10 years without creating excessive amounts of revenue bond debt. Stress on the general fund and insufficient facility reserve funds for programmed needs.
239
Made with FlippingBook - Online Brochure Maker