FY26 Proposed Budget

City of Iowa City Capital Improvement Program Unfunded Projects

Project Name

Description

Unfunded Amt

35 Gilbert Street Functional Design - Hwy 6 To Kirkwood

Obtain consulting services to provide a functional design of Gilbert Street between Hwy 6 & Kirkwood Avenue. The functional design should take into account all previous design work completed for the corridor. This project will reconstruct and elevate Foster Road from No Name Street to Dubuque Road. This project will construct a roundabout at Camp Cardinal Boulevard / Kennedy Parkway. This project is intended for the unfunded list of projects. The extensions of these streets plays an important part in the overall development of the Riverfront Crossings area. It will also improve access and the traffic circulation in this area. This project does not include any costs necessary for the property acquisitions. This project will provide landscaping and street/pedestrian lighting on Gilbert Street from College Street to the Gilbert Street Bridge over Ralston Creek This project will reconstruct Washington Street from Madison Street to Clinton Street and will include new street pavement, sidewalk, curb ramps, utility repairs/improvements and other associated work. This project will construct a 5' wide ADA sidewalk on Friendship Street between 5th Ave and 7th Ave This project will construct dedicated left-turn lanes (or a center left-turn lane) on Herbert Hoover Highway at American Pharoah Drive, Hanks Drive and Thunder Gulch Road. This project is intended to be placed on the unfunded list of projects until the pending traffic study is complete. This project generally includes the construction of a raised midblock crosswalk on Lakeside Drive between Aniston Street and Amber Lane at the Sycamore Greenway Trail This project includes the reconstruction of three blocks of brick street along Linn Street from Bloomington Street to Church Street Reconstruction of Park Road from Rocky Shore Drive to the west project limits of the Gateway Project, approximately

$60,000

36 Foster Road Elevation

$7,800,000

37 Camp Cardinal Blvd / Kennedy Parkway - Roundabout

$2,058,839

38 Kirkwood Ave to Capitol Street Connection

$3,100,000

39 Gilbert Street Lighting &

$975,000

Landscaping Improvements

40 Washington Street Recon - Madison to Clinton

$2,700,000

41 Friendship Sidewalk Infill - 5th Ave to 7th Ave 42 Herbert Hoover Highway - Turn Lanes

$210,000

$6,400,000

43 Lakeside Drive Crosswalk Improvements

$240,000

44 Linn Street Reconstruction

$3,650,000

45 Park Road Reconstruction - Rocky Shore to Riverside

$7,500,000

Riverside Drive. This project will include new street pavement, sidewalk, utility improvements and other associated work.

46 Kitty Lee Road SW Improvements This project is necessary to provide an adequate secondary access for the future Carson Farms and other developments in the area. 47 Ridgewood Lane Reconstruction This project includes complete reconstruction of Ridgewood Lane and a portion of Virginia Drive, as well as water main and storm sewer replacement.

$7,700,000

$700,000

3 - Transportation Services

48 Rock Island Railroad Depot Restoration

Preparation of Old Rock Island Railroad Depot for Amtrak service, including platform construction, lighting, utilities, passenger information display, ticketing kiosks, canopy, warming shelter, signage, parking, and accessibility improvements. Project to replace all LED fixtures in the Court Street Transportation Center, Capitol Street ramp, Dubuque Street ramp, Tower Place ramp, Chauncey Swan Ramp, and fixtures in other facilities as they age out of production.

$5,381,000

49 Replacement of LED fixtures in Parking Facilities

$200,000

640

Made with FlippingBook - Online Brochure Maker