Final FY25 Adopted Budget
2024 2028 thru
Capital Improvement Plan 2024-2028 City of Iowa City, Iowa
PUBLIC WORKS
Department
Contact Tim Wilkey
Multi-Phase
Type
V3164
Project #
20 years
Useful Life
Project Name Return Activated Sludge Pump Replacement
Wastewater Treatment
Category
GRANTEE NONE
PLAN None
Essential (2)
Priority
MATCH % NONE
TIF DISTRICT None
Active
Status
Total Project Cost: $300,000
Description The project would include the replacement of return activaterd sludge pumps (RAS) 7121A, 7122A, 7123A, 5301A and 5401A along with associated equipment. This includes all pumps, valves, sludge and any piping/structural modifications required to fit the pumps.
Justification These pumps and valves have been in service since 2002 and are nearing the end of their useful working life. The maintenance repair frequency for these pumps has been increasing in the past year. Failure to replace these pumps in a timely manner could cause diminished operation and treatment of the wastewater resulting in violations of our NPDES discharge permit.
Expenditures
Total
2024
2025
2026
2027
2028
CONSTRUCTION
300,000
300,000
300,000
300,000
Total
Funding Sources
Total
2024
2025
2026
2027
2028
WASTEWATER FUND
300,000
300,000
300,000
300,000
Total
Budget Impact/Other New pumps and associated equipment would increase pump efficiency, and lower energy consumption and maintenance costs. The estimated reduction in operating expenditures is less than $10,000 per year.
610