2022-2026 Capital Improvement Program.pdf

Source

Project # Priority 2022

Total

2023

2024 2025 2026

Transit Interchange and Bus Stop Improvements

2

120,000

120,000

120,000

120,000

120,000

T3067

600,000

5,600,000

120,000

120,000 5,120,000

120,000

120,000

TRANSIT FUND Total

UNIVERSITY OF IOWA

Entrance Way Improvements

4 1 1

100,000 325,000

P3988 S3978 Z4406

100,000 325,000 512,000

Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab

Fire Apparatus Replacement Program

272,000

240,000

937,000

425,000

272,000

240,000

UNIVERSITY OF IOWA Total

UTILITY FRANCHISE TAX

Annual Pavement Rehabilitation Underground Electrical Facilities

1 2

125,388 188,082

125,388 188,082

125,388 188,082

125,388 188,082

125,388 188,082

S3824 S3826

626,940 940,410

1,567,350

313,470

313,470

313,470

313,470

313,470

UTILITY FRANCHISE TAX Total

WASTEWATER FUND

Equipment Maintenance Facility replacement Annual Sewer Main Replacement Hawkeye Lift Station Rehabilitation Wastewater Plant Mixer Improvements Biosolids Conveyor Improvements Benton Street Trunk Sewer Improvements Aeration Basin Electric & Instrument Improvements Return Activated Sludge Pump Replacement Replacement of Influent Pump Station Pumps

2 2 2 2 2 1 3 2 2 2 1 1 2 1 3 1 2 2 2 2 2 2

1,000,000

P3953 V3101 V3154 V3157 V3158 V3162 V3163 V3164 V3165 V3167 V3169 V3170 V3172 V3173 V3174 V3175 V3176 V3177 V3178 V3179 V3180 V3181

1,000,000 3,750,000 1,025,000

750,000

750,000

750,000

750,000

750,000

1,025,000

238,000 170,000

238,000 170,000 580,000 300,000

580,000

300,000

1,009,000

1,009,000

605,000

605,000 394,000

Replace Grit Classifiers

394,000

Napoleon Lift Station Improvements

1,475,000

1,475,000 900,000 150,000 175,000 251,000 71,000 371,000 526,000 2,036,000 1,210,000

WWTP Roof Replacements

300,000

300,000

300,000

Highlander Lift Station Improvements

150,000 175,000

Jet Truck Replacement

Aeration Equipment Improvements

2,036,000

Influent Flow Monitoring

251,000 71,000

Treatment Plant Paving Improvements

HVAC Replacement

35,000 526,000

336,000

Primary Clarifier Repairs

Rotating Drum Thickener Replacement

1,210,000

Peninsula Control Panel and Pump Improvement

97,500

97,500 212,000

Wastewater Division Master Plan

212,000

16,545,500

2,474,000 3,130,000 4,084,000 3,338,000 3,519,500

WASTEWATER FUND Total

WATER FUND

Equipment Maintenance Facility replacement Bradford Drive Water Main Replacement Hwy 1 (Hawk Ridge to WalMart) Water Main Repl High Service Pump VFD Replacement Chlorine Feeder System Upgrade Water Front Meeting Room A/V Upgrades GSR Generator Enclosure Replacement Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl

2 3 2 2 2 3 2 1 2

800,000 50,000

P3953 W3300 W3313 W3314 W3316 W3317 W3318 W3320 W3321

800,000 650,000 626,000 650,000 200,000 65,000 40,000 661,500 150,000

600,000

626,000

50,000

600,000

200,000 65,000 40,000

67,500

594,000 150,000

Treatment Technology Study

529