2022-2026 Capital Improvement Program.pdf
CAPITAL PROJECTS FUND
F Y 2 0 2 3
Fund Summary Summary by Division Summary by Funding Source Annual Recurring Projects Project Summary by Name Unfunded Projects
CAPITAL PROJECTS FUND The Capital Projects Fund accounts for the collection and disbursement of funds related to capital improvements or significant capital equipment. The City annually updates and issues a five-year capital improvement program (CIP). This program is the planning guide for the City’s issuance of bonded debt and for the construction and replacement of the City’s buildings and infrastructure. The first two years of the five-year capital improvement program (CIP) are certified as part of the operating budget in the Capital Projects Fund. The current five-year CIP is for years 2022-2026. Additional information for the City’s five-year CIP program including maps and photos is available on the City’s web page: https://www.icgov.org/budget under the Capital Improvement Program heading. Capital improvement projects involve the construction, purchase, or renovation of city facilities or property. Most of the projects are specific, non-recurring major improvements to the City's physical plant, are permanent in nature, and are greater than $25,000 and have a useful life of three years or more. The City also budgets annually recurring project funds for non-specified improvements of a specific nature; these funds are to be spent on improvements that meet the same definition above. Funding sources for capital improvement projects may be from operating funds, bond proceeds, grants, donations, and a variety of other funding sources. The three largest sources of funds are operating transfers in, bonded debt, and state and federal grants. For the CIP for years 2022-2026, the total funding sources are $205,922,725, and the total expenditures are $205,848,950. The difference between the total expenditures and the total funding sources over the five-year period is a result of prior plan funding sources that are being utilized to cover current plan expenditures such as engineering and design. The 2023 CIP expenditures of $47,356,220 will be certified as part of the fiscal year 2023 operating budget. The 2023 CIP funding sources of $47,958,995 will also be certified as part of the fiscal year 2023 operating budget. Budgeted fiscal year 2023 Capital Projects Fund revenues and transfers in also include a transfer in from the TIF funds to reimburse for prior year expenditures of $25,758. Total Capital Projects Fund fiscal year 2023 budgeted revenues and transfer in are $47,984,753. The changes to the 2022 CIP are amended into the fiscal year 2022 operating budget. The fiscal year 2022 Capital Projects Fund expenditure budget also includes totals from the carry forward of prior year projects that must be re-appropriated with the State. The amounts being carried forward from prior years are not included in the five-year CIP totals. The revised Capital Projects Fund expenditures for fiscal year 2022 are $77,959,172; the revised budget includes the 2022 CIP expenditures of $28,788,020
514
and prior year project carry forwards of $49,171,152. A transfer out of $425,000 was carried forward from fiscal year 2021 for the final payment of the State sales tax flood mitigation grant loan to the Wastewater Fund. The revised fiscal year 2022 Capital Projects Fund revenues and transfers in budget also includes totals from the carry forward of prior year projects. The amounts being carried forward from prior years are not included in the five-year CIP totals. The revised Capital Projects Fund revenues and transfers in for fiscal year 2022 are $39,931,472; the revised budget includes the 2022 CIP funding sources of $26,784,020 and a transfer in from the TIF funds to reimburse for prior year expenditures of $18,191, and prior year project carry forwards of $13,129,261. Fund balance in the Capital Projects Fund primarily represents unspent funding sources from the current year and prior years. This balance fluctuates based on the timing of the issuance of bonds and the timing of the project expenditures. The estimated ending fund balance for fiscal year 2023 is $4,272,915.
515
Capital Projects Fund Fund Summary
2019
2020
2021
2022
2023
2024
Actual
Actual
Actual
Revised
Budget
Projected
Fund Balance, July 1
$
3,644,382
51,478,202 $
37,683,022 $
38,062,482 $
42,097,081 $
$
4,272,915
Revenues:
Use Of Money And Property Interest Revenues
$
-
$
745,132
$
499,001
$
162,752
$
-
$
-
Intergovernmental Federal Intergovernmental Revenue
2,357,525
347,216
1,044,497
1,458,355
8,227,394
16,005,000
-
Disaster Assistance Other State Grants State 28E Agreements Local 28E Agreements
-
-
-
-
- -
650,000 425,000
2,723,823
4,961,896
1,643,322
3,777,578
161,848 25,000
90,661 25,000
91,484 31,740
50,000
272,000
-
1,600,000
-
Charges of Fees & Services Development Fees Miscellaneous Contributions & Donations
-
63,645
93,462
355,368
-
-
- - -
10,000
25,000
6,495
195,000
- - -
Printed Materials
4,360
885
525
- -
Other Miscellaneous Revenue
27,002
121,490
288,162
Other Financial Sources Debt Sales Sub-Total Revenues
27,756,000 31,188,525
12,565,848 16,673,874
13,012,385 19,874,276
12,744,378 16,782,581
10,100,000 23,949,972
12,215,000 28,492,000
Transfers In:
Transfers-In from Governmental Funds Transfers-In from Enterprise Funds
4,906,228 10,890,000
6,987,195 9,138,147
4,751,737 8,020,378
4,456,604 7,447,763
6,558,661 8,509,863
9,874,770 14,355,000
-
Miscellaneous Transfers-In
107,684
3,335
35,351
87,976
-
Internal Service (Non-Budgetary): Equipment Fund
1,000,000 16,796,228
-
-
-
825,000
3,500,000 27,729,770
Sub-Total Transfers In
16,233,026
12,775,451
11,939,718
15,981,500
Total Revenues & Transfers In
47,984,753 $
32,906,900 $
32,649,727 $
28,722,299 $
39,931,472 $
56,221,770 $
Expenditures:
Governmental:
General Government Culture & Recreation
$
-
$
440,206
$
1,060,808 5,556,924
$
2,827,102 2,482,195
$
869,855
$
-
4,305,000
8,245,547 8,407,063
9,139,432
6,975,000
Community and Economic Dvlpmnt
- -
237,979 768,914
97,096
398,077
-
Public Safety Public Works
5,026
1,895,807 11,031,324
2,056,319 41,630,909
1,531,300 20,860,470
15,460,470
22,655,067
16,948,609
Enterprise:
Parking Operations Public Transportation Wastewater Treatment
700,000 120,000
288,825 178,752
70,266 36,345
61,616 89,234
3,141,861
632,000
948,191
20,120,000 3,059,000
19,466,000 1,042,500
2,203,521
3,025,409 1,137,779
2,453,813
7,737,166 3,101,800 550,000 3,452,104 3,136,294 1,797,164 77,959,172
Water Operations Refuse Operations
922,313
376,206
844,000
-
-
- -
-
-
Landfill
5,175,000
1,698,022
879,645 879,466 664,196
840,000 990,000 450,000
Storm Water
690,000 397,250
226,608 156,128
594,327
Airport
1,082,908 30,520,267
Sub-Total Expenditures
47,356,220
45,427,080
23,737,700
56,301,770
Transfers Out:
- -
Miscellaneous Transfers Out
1,275,000 1,275,000
1,750,000 1,750,000
950,000 950,000
425,000 425,000
- -
Sub-Total Transfers Out
Total Expenditures & Transfers Out
47,356,220 $
46,702,080 $ 37,683,022 $
32,270,267 $ 38,062,482 $
24,687,700 $ 42,097,081 $
78,384,172 $
56,301,770 $
Fund Balance, June 30
$
4,272,915
$
3,644,382
$
4,192,915
516
Capital Improvement Plan 2022-2026 City of Iowa City, Iowa
thru 2022 2026
',9,6,21 SUMMARY
Total
2022
2023
2024
2025
2026
Category
Airport
1,148,750
397,250
450,000
1,400,000
1,170,000
4,566,000 12,825,000 3,217,800 4,655,000 7,133,800
Equipment
825,000 95,000 955,000 838,800 150,000
1,000,000
11,000,000 1,422,800 1,100,000
Fire
1,700,000
Government Buildings
1,700,000 5,175,000
550,000
350,000 280,000 400,000 500,000
Landfill Library
840,000
375,000 737,500
925,000
Parking Operations Parks Maintenance
2,090,000 1,480,000
700,000
632,000
4,659,500 12,265,000
2,605,000
3,720,000
1,240,000
3,220,000
Police
125,000
108,500
233,500 750,000
Public Works Administration
750,000
Recreation
100,000
500,000
5,500,000 1,745,000
6,100,000 6,120,000 3,785,000 79,599,350 20,600,000 32,846,500 5,567,500
Senior Center
2,720,000 1,625,000 11,870,470
1,655,000
Stormwater
690,000
990,000
240,000
240,000
Street Operations Transit Operations
13,710,470
9,860,470 20,120,000 3,059,000
27,147,470
17,010,470
120,000
120,000
120,000
120,000
Wastewater Treatment
3,464,000 1,181,000
19,466,000 1,042,500
3,338,000 1,200,000
3,519,500 1,300,000
Water Operations
844,000
205,848,950
28,788,020
47,356,220
56,301,770
43,592,970
29,809,970
TOTAL
517
Capital Improvement Program by Division 2022-2026 $205,848,950
Streets, $79,599,350
Wastewater, $32,846,500
Stormwater, $3,785,000
Water, $5,567,500
Senior Center, $6,120,000
Airport, $4,566,000
Fire, $3,217,800
Public Works Admin, $750,000 Recreation, $6,100,000
Equipment, $12,825,000
Police, $233,500
Landfill, $7,133,800
Transit, $20,600,000
Library, $925,000
Government Buildings, $4,655,000
Parks Maint, $12,265,000
Parking, $4,659,500
518
Capital Improvement Plan 2022-2026 City of Iowa City, Iowa
2022
2026 thru
PROJECTS BY ',9,6,21
Category
Project # Priority
Total
2022
2023 2024 2025 2026
Airport
Airport Parking Lot Expansion Hangar A Door Replacement
A3447 A3462 A3465 A3466 A3470 A3471 A3473 A3474 A3475 A3476
3 2 1 2 1 1 2 2 2 1
75,000 94,000
75,000 94,000 150,000
Runway 7 Environmental Assessment
150,000
Runway 7 Extension (213')
1,170,000
1,170,000
Runway 25 Threshold Relocation
566,000
566,000 397,250
Runway 12/30 Threshold Displacement/Relocation
397,250
Airport Apron Expansion
1,250,000
1,250,000
Runway 7/25 Pavement Repairs Runway 12/30 Pavement Repairs
250,000 200,000
250,000 200,000 413,750
South Hanger Development Apron Expansion
413,750
4,566,000
1,148,750
397,250
450,000 1,400,000 1,170,000
Airport Total
Equipment
Equipment Maintenance Facility replacement Non-Public Safety Radio System Upgrade
P3953 P3987
2 1
1,000,000 11,000,000
12,000,000
825,000
825,000
12,825,000
825,000 1,000,000 11,000,000
Equipment Total
Fire
Fire Apparatus Replacement Program
Z4406 Z4409 Z4410 Z4411
1 2 2 2
1,360,000
1,200,000
2,560,000
Fire Station #1 Apparatus Bay Slab Reconstruction Fire Station #1 Carpet/Tile Flooring Replacement Fire Station #5 Construction and #3 Replacement
95,000
95,000 62,800 500,000
62,800
500,000
3,217,800
95,000
1,422,800
1,700,000
Fire Total
Government Buildings
City Hall - Other Projects
R4129 R4194 R4330 R4332 R4351 R4370 R4381 R4388
1 3 1 3 1 2 2 1
400,000 250,000 50,000 205,000
260,000 250,000 50,000 250,000 640,000 250,000
50,000 250,000 50,000
50,000 250,000 50,000
50,000 250,000 50,000
810,000
Climate Action Facility Improvements Annual Recreation Center Improvements
1,250,000
250,000 205,000 950,000 640,000 300,000 250,000
Upgrade Building BAS Controls Recreation Center Improvements
700,000
Robert A. Lee Recreation Center Pool Filter & HVAC
Event Facility Improvements ADA Elevator Improvements
50,000
50,000
200,000
4,655,000
955,000 1,700,000 1,100,000
550,000
350,000
Government Buildings Total
Landfill
Landfill Equipment Building Replacement
L3328 L3333 L3335 L3338 L3340 L3342
2 2 3 1 2 2
100,000 1,000,000
1,100,000
Compost Pad Improvements
30,000 60,000
300,000 540,000
330,000 600,000
Landfill Dual Extraction System Expansion
Future Landfill Cell Bulk Water Fill Station Leachate Lagoon updates
215,000 4,085,000
4,300,000
175,000 150,000
175,000 150,000
519
Category
Project # Priority L3344 1
Total
2022
2023 2024 2025 2026
ACM Landfill Gas Infrastructure Expansion
198,800
198,800 280,000
Excavator for compost operations
L3345
2
280,000
7,133,800
838,800 5,175,000
840,000
280,000
Landfill Total
Library
Carpet and Furnishings Replacement Automated Material Handler/Sorter
B4343 B4346
2 3
375,000
400,000
775,000 150,000
150,000
925,000
150,000
375,000
400,000
Library Total
Parking Operations
Parking Facility Restoration Repair Video Cameras for Parking Facilities
T3004 T3021 T3022 T3023 T3025 T3026 T3027 T3028
2 3 3 2 2 1 1 3
650,000 100,000 90,000
500,000
500,000
500,000
500,000
2,650,000
100,000 90,000
Parking Enforcement Vehicles
Parking Ramp Automated Parking Equipment Replacement of LED fixtures in Parking Facilities Tower Place Drainage Modifications Parking Ramp Stairwell Roof Replacement
1,000,000
1,000,000
200,000
200,000
400,000 237,500 50,000 132,000
237,500
50,000
Tower Place Office Remodel
132,000
4,659,500
2,090,000
700,000
632,000
737,500
500,000
Parking Operations Total
Parks Maintenance
Parks Annual Improvements/Maintenance Park Annual ADA Accessibility Improvements
R4130 R4132 R4206 R4227 R4346 R4350 R4357 R4358 R4359 R4362 R4363 R4365 R4368 R4371 R4372 R4374 R4375 R4380 R4382 R4384 R4385 R4387 R4389 R4390 R4391 R4392
1 2 2 5 2 2 2 2 2 3 2 2 2 2 2 3 2 4 5 2 2 2 2 2 5 2
90,000 30,000 25,000
90,000 30,000 25,000
90,000 30,000 25,000
90,000 30,000 25,000
90,000 30,000 25,000
450,000 150,000 125,000 700,000 390,000 150,000 600,000 425,000 450,000 600,000 245,000 450,000 175,000 950,000 300,000 500,000 180,000 135,000 350,000 575,000 300,000 240,000 175,000 700,000 1,700,000 1,250,000
Intra-city Bike Trails
Hwy 6 Sidepath - Broadway to Fairmeadows Palisades or Stone Bridge Park Development Chadek Green Park Playground & and Shelter Whispering Meadows Park Ecological Restoration Lower City Park Shelters & Restroom Replacement Kiwanis Park Playground & Shelter Renovation Napoleon Park Softball Fields 5-8 Renovation Happy Hollow Playground Replacement Terrell Mill Skate Park Redevelopment Mercer Park Ball Diamond Improvements Hunter's Run Park Playground & Shelter Annual Contracted Tree Planting Off Road Bike Trail Development Benton Hills Playground Replacement College Green Park Playground Willow Creek Trail Replacement N. Market Square Playground Replacement Upper City Park Improvements Hickory Hill Park Conklin St Shelter & Restrooms Court Hill Park Shelter & Playground Replacement
200,000 1,500,000
350,000
350,000
390,000 150,000
600,000
425,000
450,000
50,000
550,000 245,000
450,000
175,000
1,250,000
950,000 300,000 100,000
100,000 180,000
100,000
100,000
100,000
135,000
350,000
65,000
510,000
300,000 240,000
Reno Street Park Renovations Tennis Court Renovations Westside Park Land Acquisition
175,000
700,000
12,265,000
1,480,000 2,605,000 3,720,000 1,240,000 3,220,000
Parks Maintenance Total
Police
Digital Photo Evidence Management Animal Shelter Standy Generator
Y4446 Y4447
3 2
125,000
125,000 108,500
108,500
233,500
125,000
108,500
Police Total
520
Category
Project # Priority
Total
2022
2023 2024 2025 2026
Public Works Administration
Entrance Way Improvements
P3988
4
750,000
750,000
750,000
750,000
Public Works Administration Total
Recreation
City Park Pool Replacement Splash Pad Improvements
R4229 R4230
3 2
500,000 5,500,000
6,000,000
100,000
100,000
6,100,000
100,000
500,000 5,500,000
Recreation Total
Senior Center
Senior Center Facility Exterior Improvements Senior Center Interior Improvements Project
K1001 K1002
4 3
2,720,000
2,720,000 3,400,000
1,655,000 1,745,000
6,120,000
2,720,000
1,655,000 1,745,000
Senior Center Total
Stormwater
Annual Stormwater Improvements
M3631 M3633 M3634 M3635
2 2 2 2
240,000
240,000
240,000
240,000
960,000
North Westminster Storm Sewer Upgrades Rundell Street Pump Station Vault Modifications River Street Storm Sewer Improvements
1,625,000
1,625,000
350,000 100,000
350,000 850,000
750,000
3,785,000
1,625,000
690,000
990,000
240,000
240,000
Stormwater Total
Street Operations
Annual Traffic Signal Projects
S3814 S3816 S3822 S3824 S3826 S3827 S3910 S3939 S3940 S3946 S3950 S3951 S3952 S3955 S3956 S3958 S3959 S3960 S3963 S3965 S3977 S3978 S3979 S3980
3 3 1 1 2 3 1 1 2 2 2 2 2 2 1 2 2 2 1 2 2 1 2 5
300,000 50,000 100,000 188,082 150,000 250,000
200,000 15,000 100,000 188,082 150,000 250,000
200,000 15,000 100,000 188,082 150,000 250,000
200,000 15,000 100,000 188,082 150,000 250,000
200,000 15,000 100,000 188,082 150,000 250,000
1,100,000
Traffic Calming Curb Ramps-ADA
110,000 500,000
Annual Pavement Rehabilitation Underground Electrical Facilities Bicycle Master Plan Implementation Annual Bridge Maintenance & Repair Dubuque Street Reconstruction
2,107,388 2,107,388 2,107,388 2,107,388 2,107,388
10,536,940
940,410 750,000
1,250,000 3,000,000
300,000 2,700,000
Kirkwood Avenue to Capitol Street Connection
100,000
100,000
Court Street Reconstruction
150,000
6,450,000
6,600,000 6,350,000
Rochester Ave Reconst- First Ave. to Ralston Creek Hwy 1/Hwy 6 Intersection Improvements Study Dodge Street Reconstruct - Governor to Burlington
6,350,000
150,000
150,000
15,750,000 1,237,000
15,750,000 1,437,000 3,125,000 6,700,000 11,000,000 1,350,000 2,250,000 1,300,000 1,850,000 2,600,000 100,000 750,000
N. Gilbert Street Reconstruction Gilbert Street Bridge Replacement
200,000
3,125,000
Park Road Reconstruct - Rocky Shore to Riverside Taft Avenue Reconstruct - Am Legion to Lwr West Br
700,000
6,000,000
1,000,000
10,000,000
Oakdale Blvd Extension - Alignment Study Burlington Street Bridge Replacement
100,000 750,000
Fairchild Street Reconstruction Iowa Avenue Bridge Rehabilitation
1,350,000
150,000 2,100,000 225,000 1,075,000
Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab South Dubuque St Reconstruction - Wright to Benton Market & Jefferson Street Two-Way Conversion
250,000
1,600,000
300,000 2,300,000
79,599,350
11,870,470 13,710,470 9,860,470 27,147,470 17,010,470
Street Operations Total
Transit Operations
Transit Maintenance Facility Relocation
T3055 T3067
2 2
20,000,000
20,000,000
Transit Interchange and Bus Stop Improvements
120,000
120,000
120,000
120,000
120,000
600,000
521
Category
Project # Priority
Total
2022
2023 2024 2025 2026
20,600,000
120,000
120,000 20,120,000
120,000
120,000
Transit Operations Total
Wastewater Treatment Annual Sewer Main Replacement Digester Complex Rehabilitation Hawkeye Lift Station Rehabilitation
V3101 V3151 V3154 V3155 V3157 V3158 V3162 V3163 V3164 V3165 V3167 V3169 V3170 V3172 V3173 V3174 V3175 V3176 V3177 V3178 V3179 V3180 V3181 W3300 W3313 W3314 W3316 W3317 W3318 W3320 W3321 W3322 W3323 W3324 W3325 W3326 W3327
2 1 2 2 2 2 1 3 2 2 2 1 1 2 1 3 1 2 2 2 2 2 2 3 2 2 2 3 2 1 2 1 2 3 2 2 2
750,000
750,000
750,000
750,000
750,000
3,750,000 12,801,000 1,025,000 4,500,000
880,000 11,921,000
25,000 1,000,000
Rohret South Sewer
110,000 4,390,000
Wastewater Plant Mixer Improvements Biosolids Conveyor Improvements Benton Street Trunk Sewer Improvements
238,000 170,000
238,000 170,000 580,000 300,000
580,000
Aeration Basin Electric & Instrument Improvements Return Activated Sludge Pump Replacement Replacement of Influent Pump Station Pumps
300,000
1,009,000
1,009,000
605,000
605,000 394,000
Replace Grit Classifiers
394,000
Napoleon Lift Station Improvements
1,475,000
1,475,000 900,000 150,000 175,000 251,000 71,000 371,000 526,000 2,036,000 1,210,000
WWTP Roof Replacements
300,000
300,000
300,000
Highlander Lift Station Improvements
150,000 175,000
Jet Truck Replacement
Aeration Equipment Improvements
2,036,000
Influent Flow Monitoring
251,000 71,000
Treatment Plant Paving Improvements
HVAC Replacement
35,000 526,000
336,000
Primary Clarifier Repairs
Rotating Drum Thickener Replacement
1,210,000
Peninsula Control Panel and Pump Improvement
97,500
97,500 212,000
Wastewater Division Master Plan
212,000
32,846,500
3,464,000 19,466,000 3,059,000 3,338,000 3,519,500
Wastewater Treatment Total
Water Operations
Bradford Drive Water Main Replacement
50,000
600,000
650,000 526,000 650,000 200,000 65,000 40,000 661,500 150,000 250,000 75,000 100,000 600,000 600,000 1,000,000
Hwy 1 (Hawk Ridge to WalMart) Water Main Repl High Service Pump VFD Replacement Chlorine Feeder System Upgrade Water Front Meeting Room A/V Upgrades GSR Generator Enclosure Replacement Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl
526,000
50,000
600,000
200,000 65,000 40,000
67,500
594,000 150,000
Treatment Technology Study
Collector Well #2 Cleaning and Upgrade Water Distribution Asset Inventory
100,000 250,000
900,000
Water Plant HVAC Study
75,000
Roof Replacements
100,000 600,000 600,000
Treatment Process Update
Melrose Water Main Camp Cardinal to 218
5,567,500
1,181,000 1,042,500
844,000 1,200,000 1,300,000
Water Operations Total
205,848,950
28,788,020 47,356,220 56,301,770 43,592,970 29,809,970
GRAND TOTAL
522
Capital Improvement Plan 2022-2026 City of Iowa City, Iowa
2022 thru 2026
FUNDING SOURCE SUMMARY
Total
2022
2023
2024
2025
2026
Source
AIRPORT FUND
81,063 350,000 825,000
32,500 350,000
45,000 350,000
140,000 350,000
117,000 350,000
415,563
EMERGENCY LEVY EQUIPMENT FUND
1,750,000 5,325,000 11,800,000 29,211,212 5,534,300 51,077,000 9,185,000 3,333,800 5,300,000 10,638,000 3,659,500 17,671,000 13,620,000 4,035,000 2,000,000 5,600,000 1,567,350 16,545,500 6,467,500 250,000 937,000
1,000,000
3,500,000 5,500,000 16,005,000 1,014,300 8,765,000 3,450,000 1,340,000
FACILITY REPLACEMENT RESERVE
5,800,000 5,010,000
500,000
FEDERAL GRANTS GENERAL FUND
765,687 950,000
2,357,525 1,520,000 7,600,000 2,485,000 1,090,000 4,085,000
5,073,000 1,130,000 14,630,000
920,000
GO BONDS-ESSENTIAL PURPOSE GO BONDS-GENERAL PURPOSE
8,700,000 1,400,000
11,382,000 1,400,000
450,000 280,000
LANDFILL FUND
623,800
LANDFILL REPLACEMENT RESERVE
1,215,000
OTHER STATE GRANTS
138,000
650,000 700,000
9,850,000
PARKING FUND
1,090,000
632,000 250,000
737,500
500,000
REFUSE COLLECTION FUND
REVENUE BONDS
17,671,000 2,697,000
ROAD USE TAX FUND STORMWATER FUND
2,832,000 1,625,000 2,000,000
2,697,000 1,240,000
2,697,000
2,697,000
690,000
240,000
240,000
TAX INCREMENT FINANCING
TRANSIT FUND
120,000
120,000 425,000 313,470
5,120,000
120,000
120,000 240,000 313,470
UNIVERSITY OF IOWA UTILITY FRANCHISE TAX WASTEWATER FUND
272,000 313,470
313,470
313,470
2,474,000 1,281,000
3,130,000 1,042,500
4,084,000 1,644,000
3,338,000 1,200,000
3,519,500 1,300,000
WATER FUND
26,784,020
47,958,995
56,221,770
43,497,970
31,459,970
205,922,725
GRAND TOTAL
523
Capital Improvement Program by Funding Source 2022-2026 $205,922,725
Equipment, $5,325,000
GO Bonds, $60,262,000
Revenue Bonds, $17,671,000
Refuse Collection, $250,000
Emergency Levy, $1,750,000
Utility Franchise Tax, $1,567,350
Tax Increment Financing, $2,000,000
Stormwater, $4,035,000
Facility Replacement Reserve, $11,800,000
Airport, $415,563 Landfill, $8,633,800
Transit, $5,600,000
Federal Grants, $29,211,212
Parking, $3,659,500
Wastewater, $16,545,500
University of Iowa, $937,000
Other State Grants, $10,638,000
Water, $6,467,500
General Fund, $5,534,300 Road Use Tax, $13,620,000
524
Capital Improvement Plan 2022-2026 City of Iowa City, Iowa PROJECTS BY FUNDING SOURCE 2022 2026 thru
Source
Project # Priority 2022
Total
2023
2024 2025 2026
AIRPORT FUND
Hangar A Door Replacement
2 1 2 1 2 2 2 1
19,000
A3462 A3465 A3466 A3471 A3473 A3474 A3475 A3476
19,000 15,000 117,000 32,500 125,000 25,000 20,000 62,063
Runway 7 Environmental Assessment
15,000
Runway 7 Extension (213')
117,000
Runway 12/30 Threshold Displacement/Relocation
32,500
Airport Apron Expansion
125,000
Runway 7/25 Pavement Repairs Runway 12/30 Pavement Repairs
25,000 20,000
South Hanger Development Apron Expansion
62,063
415,563
81,063
32,500
45,000
140,000
117,000
AIRPORT FUND Total
EMERGENCY LEVY
Climate Action Facility Improvements Annual Contracted Tree Planting
3 4
250,000 100,000
250,000 100,000
250,000 100,000
250,000 100,000
250,000 100,000
R4194 R4380
1,250,000
500,000
1,750,000
350,000
350,000
350,000
350,000
350,000
EMERGENCY LEVY Total
EQUIPMENT FUND
Equipment Maintenance Facility replacement Non-Public Safety Radio System Upgrade
2 1
1,000,000 3,500,000
P3953 P3987
4,500,000
825,000
825,000
5,325,000
825,000 1,000,000 3,500,000
EQUIPMENT FUND Total
FACILITY REPLACEMENT RESER
Senior Center Interior Improvements Project Equipment Maintenance Facility replacement
3 2 3 2
1,000,000 1,000,000
K1002 P3953 R4229 Z4411
2,000,000 4,000,000 5,300,000
4,000,000
City Park Pool Replacement
500,000 4,800,000
Fire Station #5 Construction and #3 Replacement
500,000
500,000
11,800,000
5,500,000 5,800,000
500,000
FACILITY REPLACEMENT RESERVE Total
FEDERAL GRANTS
Runway 7 Environmental Assessment
1 2 1 1 2 2 2 1 5 2
135,000
A3465 A3466 A3470 A3471 A3473 A3474 A3475 A3476 R4227 R4372
135,000
Runway 7 Extension (213')
1,053,000
1,053,000
Runway 25 Threshold Relocation
414,000
414,000 357,525
Runway 12/30 Threshold Displacement/Relocation
357,525
Airport Apron Expansion
1,125,000
1,125,000
Runway 7/25 Pavement Repairs Runway 12/30 Pavement Repairs
225,000 180,000
225,000 180,000 351,687 520,000 600,000
South Hanger Development Apron Expansion Hwy 6 Sidepath - Broadway to Fairmeadows Terrell Mill Skate Park Redevelopment
351,687
520,000
600,000
525
Source
Project # Priority 2022
Total
2023
2024 2025 2026
Dodge Street Reconstruct - Governor to Burlington
2 1 2 2 2
3,750,000
S3952 S3956 S3959 S3977 T3055
3,750,000 1,000,000 3,500,000 1,000,000 15,000,000
Gilbert Street Bridge Replacement
1,000,000
Taft Avenue Reconstruct - Am Legion to Lwr West Br
3,500,000
Iowa Avenue Bridge Rehabilitation Transit Maintenance Facility Relocation
1,000,000
15,000,000
29,211,212
765,687 2,357,525 16,005,000 5,010,000 5,073,000
FEDERAL GRANTS Total
GENERAL FUND
Carpet and Furnishings Replacement Automated Material Handler/Sorter
2 3 4 1 1 2 2 2 1 2 2 3 2 5 2 1 5 2 2 3 2 1 2 5 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2 1
375,000
400,000
B4343 B4346 P3988 R4129 R4130 R4132 R4206 R4230 R4330 R4346 R4357 R4374 R4381 R4382 R4384 R4388 R4391 S3951 S3960 Y4446 Y4447 Z4406 Z4410 R4227 R4350 R4358 R4359 R4363 R4365 R4368 R4371 R4375 R4385 R4389 R4390 S3939 S3946 S3950 S3952 S3955 S3956
775,000 150,000 650,000 150,000 450,000 150,000 125,000 100,000 250,000 700,000 150,000 250,000 300,000 180,000 135,000 250,000 175,000 150,000 100,000 125,000 108,500 48,000
150,000
Entrance Way Improvements City Hall - Other Projects
650,000
50,000 90,000 30,000 25,000
50,000 90,000 30,000 25,000
50,000 90,000 30,000 25,000
Parks Annual Improvements/Maintenance Park Annual ADA Accessibility Improvements
90,000 30,000 25,000 100,000 50,000
90,000 30,000 25,000
Intra-city Bike Trails
Splash Pad Improvements
Annual Recreation Center Improvements Palisades or Stone Bridge Park Development Whispering Meadows Park Ecological Restoration
50,000
50,000 350,000
50,000
50,000 350,000
150,000
Mercer Park Ball Diamond Improvements Event Facility Improvements Off Road Bike Trail Development Benton Hills Playground Replacement
250,000 250,000
50,000 180,000
135,000
ADA Elevator Improvements Tennis Court Renovations
50,000
200,000
175,000
Hwy 1/Hwy 6 Intersection Improvements Study Oakdale Blvd Extension - Alignment Study
150,000
100,000
Digital Photo Evidence Management Animal Shelter Standy Generator Fire Apparatus Replacement Program
125,000
108,500 48,000 62,800
Fire Station #1 Carpet/Tile Flooring Replacement
62,800
5,534,300
950,000 1,520,000 1,014,300
920,000 1,130,000
GENERAL FUND Total
GO BONDS-ESSENTIAL PURPOSE Hwy 6 Sidepath - Broadway to Fairmeadows Chadek Green Park Playground & and Shelter Lower City Park Shelters & Restroom Replacement Kiwanis Park Playground & Shelter Renovation
1,180,000
1,180,000
450,000
450,000 600,000 425,000 600,000 245,000 450,000 175,000 300,000 350,000 300,000 240,000
600,000
425,000
Upper City Park Improvements
600,000 245,000
Hickory Hill Park Conklin St Shelter & Restrooms Court Hill Park Shelter & Playground Replacement
450,000
Happy Hollow Playground Replacement Hunter's Run Park Playground & Shelter
175,000
300,000
College Green Park Playground
350,000
N. Market Square Playground Replacement
300,000 240,000
Reno Street Park Renovations Dubuque Street Reconstruction Court Street Reconstruction
3,000,000
3,000,000 6,600,000 6,350,000 2,400,000 1,437,000 2,300,000
6,600,000
Rochester Ave Reconst- First Ave. to Ralston Creek Dodge Street Reconstruct - Governor to Burlington
6,350,000
2,400,000 1,437,000
N. Gilbert Street Reconstruction Gilbert Street Bridge Replacement
2,300,000
526
Source
Project # Priority 2022
Total
2023
2024 2025 2026
Park Road Reconstruct - Rocky Shore to Riverside Taft Avenue Reconstruct - Am Legion to Lwr West Br
2 2 2 2 1 2 5 1
6,700,000
S3958 S3959 S3965 S3977 S3978 S3979 S3980 Z4406
6,700,000 7,500,000 1,450,000 1,250,000 1,850,000 2,600,000 2,000,000 325,000
7,500,000
Fairchild Street Reconstruction Iowa Avenue Bridge Rehabilitation
1,450,000
1,250,000
Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab South Dubuque St Reconstruction - Wright to Benton Market & Jefferson Street Two-Way Conversion
325,000
1,850,000 2,600,000
Fire Apparatus Replacement Program
1,040,000
960,000
51,077,000
8,700,000 7,600,000 8,765,000 11,382,000 14,630,000
GO BONDS-ESSENTIAL PURPOSE Total
GO BONDS-GENERAL PURPOSE Senior Center Facility Exterior Improvements Senior Center Interior Improvements Project Equipment Maintenance Facility replacement
4 3 2 1 3 3 1 3 2 2 3 2 2 2
700,000
K1001 K1002 P3953 R4129 R4229 R4332 R4351 R4362 R4370 R4372 R4374 R4387 R4392 Z4409
700,000
700,000 700,000
700,000
1,400,000
700,000 660,000 700,000 205,000 950,000 450,000 700,000 650,000 700,000 575,000 700,000
City Hall - Other Projects City Park Pool Replacement Upgrade Building BAS Controls Recreation Center Improvements
400,000
260,000
700,000
205,000
250,000
700,000
Napoleon Park Softball Fields 5-8 Renovation Robert A. Lee Recreation Center Pool Filter & HVAC
450,000
700,000
Terrell Mill Skate Park Redevelopment Mercer Park Ball Diamond Improvements
650,000
700,000 575,000
Willow Creek Trail Replacement Westside Park Land Acquisition
700,000
Fire Station #1 Apparatus Bay Slab Reconstruction
95,000
95,000
9,185,000
1,400,000 2,485,000 3,450,000 1,400,000
450,000
GO BONDS-GENERAL PURPOSE Total
LANDFILL FUND
Landfill Equipment Building Replacement
2 2 3 2 2 1 2 2
100,000 1,000,000
L3328 L3333 L3335 L3340 L3342 L3344 L3345 P3953
1,100,000
Compost Pad Improvements
30,000 60,000
300,000 540,000
330,000 600,000 175,000 150,000 198,800 280,000 500,000
Landfill Dual Extraction System Expansion
Bulk Water Fill Station Leachate Lagoon updates
175,000 150,000 198,800
ACM Landfill Gas Infrastructure Expansion
Excavator for compost operations
280,000
Equipment Maintenance Facility replacement
500,000
3,333,800
623,800 1,090,000 1,340,000
280,000
LANDFILL FUND Total
LANDFILL REPLACEMENT RESE
Future Landfill Cell
1 2
215,000 4,085,000
L3338 T3023
4,300,000 1,000,000
Parking Ramp Automated Parking Equipment
1,000,000
5,300,000
1,215,000 4,085,000
LANDFILL REPLACEMENT RESERVE Total
OTHER STATE GRANTS
Airport Parking Lot Expansion Hangar A Door Replacement
3 2 2
63,000 75,000
A3447 A3462 S3952
63,000 75,000
Dodge Street Reconstruct - Governor to Burlington
9,850,000
9,850,000
527
Source
Project # Priority 2022
Total
2023
2024 2025 2026
Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab
1
650,000
S3978
650,000
10,638,000
138,000
650,000
9,850,000
OTHER STATE GRANTS Total
PARKING FUND
Parking Facility Restoration Repair Video Cameras for Parking Facilities
2 3 3 2 1 1 3
650,000 100,000 90,000 200,000
500,000
500,000
500,000
500,000
T3004 T3021 T3022 T3025 T3026 T3027 T3028
2,650,000
100,000 90,000 400,000 237,500 50,000 132,000
Parking Enforcement Vehicles
Replacement of LED fixtures in Parking Facilities Tower Place Drainage Modifications Parking Ramp Stairwell Roof Replacement
200,000
237,500
50,000
Tower Place Office Remodel
132,000
3,659,500
1,090,000
700,000
632,000
737,500
500,000
PARKING FUND Total
REFUSE COLLECTION FUND
Equipment Maintenance Facility replacement
2
250,000
P3953
250,000
250,000
250,000
REFUSE COLLECTION FUND Total
REVENUE BONDS
Digester Complex Rehabilitation
1 2
12,921,000 4,750,000
V3151 V3155
12,921,000 4,750,000
Rohret South Sewer
17,671,000
17,671,000
REVENUE BONDS Total
ROAD USE TAX FUND
Annual Traffic Signal Projects
3 3 1 1 3 1
300,000 50,000 100,000
200,000 15,000 100,000
200,000 15,000 100,000
200,000 15,000 100,000
200,000 15,000 100,000
S3814 S3816 S3822 S3824 S3827 S3910
1,100,000
Traffic Calming Curb Ramps-ADA
110,000 500,000
Annual Pavement Rehabilitation Bicycle Master Plan Implementation Annual Bridge Maintenance & Repair
1,982,000 1,982,000 1,982,000 1,982,000 1,982,000
9,910,000
150,000 250,000
150,000 250,000
150,000 250,000
150,000 250,000
150,000 250,000
750,000
1,250,000
13,620,000
2,832,000 2,697,000 2,697,000 2,697,000 2,697,000
ROAD USE TAX FUND Total
STORMWATER FUND
Annual Stormwater Improvements
2 2 2 2 2
240,000
240,000
240,000
240,000
M3631 M3633 M3634 M3635 P3953
960,000
North Westminster Storm Sewer Upgrades Rundell Street Pump Station Vault Modifications River Street Storm Sewer Improvements Equipment Maintenance Facility replacement
1,625,000
1,625,000
350,000 100,000
350,000 850,000 250,000
750,000 250,000
4,035,000
1,625,000
690,000 1,240,000
240,000
240,000
STORMWATER FUND Total
TAX INCREMENT FINANCING
Senior Center Facility Exterior Improvements
4
2,000,000
K1001
2,000,000
2,000,000
2,000,000
TAX INCREMENT FINANCING Total
TRANSIT FUND
Transit Maintenance Facility Relocation
2
5,000,000
T3055
5,000,000
528
Source
Project # Priority 2022
Total
2023
2024 2025 2026
Transit Interchange and Bus Stop Improvements
2
120,000
120,000
120,000
120,000
120,000
T3067
600,000
5,600,000
120,000
120,000 5,120,000
120,000
120,000
TRANSIT FUND Total
UNIVERSITY OF IOWA
Entrance Way Improvements
4 1 1
100,000 325,000
P3988 S3978 Z4406
100,000 325,000 512,000
Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab
Fire Apparatus Replacement Program
272,000
240,000
937,000
425,000
272,000
240,000
UNIVERSITY OF IOWA Total
UTILITY FRANCHISE TAX
Annual Pavement Rehabilitation Underground Electrical Facilities
1 2
125,388 188,082
125,388 188,082
125,388 188,082
125,388 188,082
125,388 188,082
S3824 S3826
626,940 940,410
1,567,350
313,470
313,470
313,470
313,470
313,470
UTILITY FRANCHISE TAX Total
WASTEWATER FUND
Equipment Maintenance Facility replacement Annual Sewer Main Replacement Hawkeye Lift Station Rehabilitation Wastewater Plant Mixer Improvements Biosolids Conveyor Improvements Benton Street Trunk Sewer Improvements Aeration Basin Electric & Instrument Improvements Return Activated Sludge Pump Replacement Replacement of Influent Pump Station Pumps
2 2 2 2 2 1 3 2 2 2 1 1 2 1 3 1 2 2 2 2 2 2
1,000,000
P3953 V3101 V3154 V3157 V3158 V3162 V3163 V3164 V3165 V3167 V3169 V3170 V3172 V3173 V3174 V3175 V3176 V3177 V3178 V3179 V3180 V3181
1,000,000 3,750,000 1,025,000
750,000
750,000
750,000
750,000
750,000
1,025,000
238,000 170,000
238,000 170,000 580,000 300,000
580,000
300,000
1,009,000
1,009,000
605,000
605,000 394,000
Replace Grit Classifiers
394,000
Napoleon Lift Station Improvements
1,475,000
1,475,000 900,000 150,000 175,000 251,000 71,000 371,000 526,000 2,036,000 1,210,000
WWTP Roof Replacements
300,000
300,000
300,000
Highlander Lift Station Improvements
150,000 175,000
Jet Truck Replacement
Aeration Equipment Improvements
2,036,000
Influent Flow Monitoring
251,000 71,000
Treatment Plant Paving Improvements
HVAC Replacement
35,000 526,000
336,000
Primary Clarifier Repairs
Rotating Drum Thickener Replacement
1,210,000
Peninsula Control Panel and Pump Improvement
97,500
97,500 212,000
Wastewater Division Master Plan
212,000
16,545,500
2,474,000 3,130,000 4,084,000 3,338,000 3,519,500
WASTEWATER FUND Total
WATER FUND
Equipment Maintenance Facility replacement Bradford Drive Water Main Replacement Hwy 1 (Hawk Ridge to WalMart) Water Main Repl High Service Pump VFD Replacement Chlorine Feeder System Upgrade Water Front Meeting Room A/V Upgrades GSR Generator Enclosure Replacement Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl
2 3 2 2 2 3 2 1 2
800,000 50,000
P3953 W3300 W3313 W3314 W3316 W3317 W3318 W3320 W3321
800,000 650,000 626,000 650,000 200,000 65,000 40,000 661,500 150,000
600,000
626,000
50,000
600,000
200,000 65,000 40,000
67,500
594,000 150,000
Treatment Technology Study
529
Source
Project # Priority 2022
Total
2023
2024 2025 2026
Collector Well #2 Cleaning and Upgrade Water Distribution Asset Inventory
1 2 3 2 2 2
100,000 250,000
900,000
W3322 W3323 W3324 W3325 W3326 W3327
1,000,000
250,000 75,000 100,000 600,000 600,000
Water Plant HVAC Study
75,000
Roof Replacements
100,000 600,000 600,000
Treatment Process Update
Melrose Water Main Camp Cardinal to 218
6,467,500
1,281,000 1,042,500 1,644,000 1,200,000 1,300,000
WATER FUND Total
205,922,725
26,784,020 47,958,995 56,221,770 43,497,970 31,459,970
GRAND TOTAL
530
Capital Improvement Plan 2022-2026 City of Iowa City, Iowa
2022
2026 thru
$QQXDO 5HFXUULQJ 3URMHFWV
Department
Project # Priority
Total
2022
2023 2024 2025 2026
PARKS & RECREATION
City Hall - Other Projects
1 1 1 1 1 1 1
400,000 90,000 30,000 250,000 25,000 50,000 100,000
260,000 90,000 30,000 250,000 25,000 50,000 100,000
50,000 90,000 30,000 250,000 25,000 50,000 100,000
50,000 90,000 30,000 250,000 25,000 50,000 100,000
50,000 90,000 30,000 250,000 25,000 50,000 100,000
R4129 R4130 R4132 R4194 R4206 R4330 R4380
810,000 450,000 150,000 125,000 250,000 500,000 1,250,000
Parks Annual Improvements/Maintenance Park Annual ADA Accessibility Improvements
Climate Action Facility Improvements
Intra-city Bike Trails
Annual Recreation Center Improvements
Annual Contracted Tree Planting
3,535,000
945,000
805,000
595,000
595,000
595,000
PARKS & RECREATION Total
2022 - Roof Replacement; 2023 - Renovate lower level restrooms. 2024 - Remodel Employee Fitness room bathroom to become ADA compliant and add toilet and sink. Update finishes and lighting in space; 2025 and 2026 - Undesignated. R4129 City Hall - Other Projects Annual funding for small capital projects and improvements throughout park system. Priorities per the 2017 Park Master Plan are: Park Signs, Site Furnishings, Shelter/Facility Maintenance, Court Maintenance, Partner Opportunities for Small Projects and Emerging Opportunities and Needs. R4130 Parks Annual Improvements/Maintenance Small projects in parks to improve and enhance physical accessility to park facilities and activity centers. 2022 - Oak Grove; 2023 - Kiwanis, Hunter's Run and Ryerson's Woods; 2024 - Reno St; 2025 - Thornberry and Crandic; 2026 - Undetermined R4132 Park Annual ADA Accessibility Improvements Improvements to municipal facilities that reduce carbon emmissions and conserve resources such as LED lighting improvements, solar panel additions, window replacements, etc. R4194 Climate Action Facility Improvements Annual projects to maintain RALRC & Mercer/Scanlon Recreation Centers. 2022 - RALRC Lower Level Flooring; 2023 RALRC Craft Room Renovations; 2024 - Renovate former shooting range and lower level storage; 2025 and 2026 not yet designated. R4330 Annual Recreation Center Improvements Annual contracted tree program for additions to street trees, neighborhood infill and park tree plantings. Areas of emphasis include low income neighborhoods as well as neighborhoods that lost trees to the Emerald Ash Borer or the 2020 Derecho storm. R4380 Annual Contracted Tree Planting Annual appropriation for the construction or repair of bike trails. R4206 Intra-city Bike Trails
531
Department
Project # Priority
Total
2022
2023 2024 2025 2026
PUBLIC WORKS
Annual Stormwater Improvements Annual Traffic Signal Projects
1 1 1 1 1 1 1 1 1
240,000 200,000 15,000 100,000 188,082 150,000 250,000 750,000
240,000 200,000 15,000 100,000 188,082 150,000 250,000 750,000
240,000 200,000 15,000 100,000 188,082 150,000 250,000 750,000
240,000 200,000 15,000 100,000 188,082 150,000 250,000 750,000
M3631 S3814 S3816 S3822 S3824 S3826 S3827 S3910 V3101
960,000
300,000 50,000 100,000 188,082 150,000 250,000 750,000
1,100,000
Traffic Calming Curb Ramps-ADA
110,000 500,000
Annual Pavement Rehabilitation Underground Electrical Facilities Bicycle Master Plan Implementation Annual Bridge Maintenance & Repair Annual Sewer Main Replacement
2,107,388 2,107,388 2,107,388 2,107,388 2,107,388
10,536,940
940,410 750,000
1,250,000 3,750,000
19,897,350
3,895,470 4,000,470 4,000,470 4,000,470 4,000,470
PUBLIC WORKS Total
This is an annual project that will repair and/or improve storm water infrastructure throughout the City. M3631 Annual Stormwater Improvements
This is an annual project to replace or add traffic signals at intersections with outdated traffic signal equipment or at dangerous and uncontrolled intersections. This project will install pan/tilt/zoom (PTZ) cameras at signalized intersections that do not currently have PTZ cameras (approximately 57 intersections) in 2022. S3814 Annual Traffic Signal Projects
Annual appropriation for traffic calming projects S3816 Traffic Calming
Annual appropriation for the construction of ADA accessible curb ramps. S3822 Curb Ramps-ADA
Annual appropriation for resurfacing roadways and alleys including asphalt, concrete, and brick. S3824 Annual Pavement Rehabilitation
This is an annual project to convert overhead electrical systems to underground. Dubuque Street, Riverside Drive, and Gilbert Street are currently the priority corridors for undergrounding electrical facilities. S3826 Underground Electrical Facilities
S3827 Bicycle Master Plan Implementation
This is an annual project to implement the recommendations of the bicycle master plan. Improvement projects include construction of bike lanes, bike boulevards, and other features that will improve streets to promote equal access and usability for all modes of transportation. Projects also fund the conversion of 4-lane roads into 3-lane roads in certain areas that are highly used by all of the various modes of transportation.Projects are scheduled as follows: 2022 - Keokuk 4 to 3 lane conversion; Gilbert 4 to 3 lane conversion, south of highway 6; Southgate Bike Lanes (Gilbert to Keokuk; Wetherby Bicycle Boulevard (Lakeside, Sandusky, Taylor, Wetherby); Hollywood Bike Bike Blvd; Lakeside Bicycle Blvd; 2023 - Sunset Bike Lanes (Benton to Highway 1); Oakcrest Bike Blvd; Emerald Bike Blvd; Arlington Bicycle Blvd; 2024 - Dover /Westminster Bike Blvd; Highland Bicycle Blvd; 2025 - Church Street Bicycle Blvd; Broadway Bike Lanes (Sandusky to Highway 6); Ridge/Broadway Bike Blvd; 2026 - Washington Street Bike Blvd (Scott Blvd to 1st Avenue); River Bike Blvd; Woolf Bike Blvd; Newton Marked Route This provides for the biennial inspection and preservation of Iowa City's bridges including major repairs and restoration. 2019 funding for this project was moved to the 2nd Avenue Bridge Replacement project. S3910 Annual Bridge Maintenance & Repair
This project consists of annual sanitary sewer repairs and preventive maintenance throughout the sewer system. V3101 Annual Sewer Main Replacement
532
Made with FlippingBook. PDF to flipbook with ease