2022-2026 Capital Improvement Program.pdf

Contact Jason Havel Depar tment PUBLIC WORKS

S3965

Pr oject #

Pr oject Name Fair child Str eet Reconstr uction

Type One Phase

Useful Life 50 years

MATCH % NONE GRANTEE NONE

TIF DISTRICT None PLAN None

Categor y Street Operations

Pr ior ity Essential (2)

Description This project includes the reconstruction of two blocks of brick street along Fairchild Street from Clinton Street to Linn Street. Total Pr oject Cost: $1,450,000

Status Active

Justification The pavement condition in these areas is poor, and several areas have utilities that are in need of repair/replacement, which is contributing to the deterioration of the street.

Expenditur es

Total

2022

2023

2024

2025

2026

Pr ior

50,000

50,000

PLANNING/DESIGN CONSTRUCTION

100,000

1,100,000

1,100,000

Total

50,000 50,000 100,000

50,000 50,000 100,000

INSPECTION

ADMINISTRATION CONTINGENCY

1,350,000

1,350,000

Total

Funding Sour ces

Total

2022

2023

2024

2025

2026

1,450,000

1,450,000

GO BONDS-ESSENTIAL PURPOSE

1,450,000

1,450,000

Total

Budget Impact/Other Estimated savings in operating expenses are less than $10,000 per year.

This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be made in respect of the above-described project, such expenditures to be advanced from the Wastewater fund, and the City reasonably expects to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the future.

601

Made with FlippingBook. PDF to flipbook with ease