Pr oject Name Iowa Avenue Br idge Rehabilitation

Type One Phase

Useful Life 20 years

MATCH % 60% GRANTEE IDOT

TIF DISTRICT None PLAN None

Categor y Street Operations

Pr ior ity Essential (2)

Description This project will be a comprehensive concrete rehabilitation of the Iowa Ave Bridge over the Iowa River. Additional repair items will include sidewalks, approach pavement, expansion joints, pedestrian handrails and painting. Justification The Iowa Avenue Bridge was built in 1916 and the most recent reconstruction project was in 1985. The most recent inspection in the summer of 2021 found it to be in Fair Condition structurally, but noted delamination, cracks and spalls in the concrete on the deck, superstructure and substructure of the bridge. Deterioration is also noted at the sidewalk approaches and abutments. To extend the longevity of the bridge, it is recommended that a comprehensive rehabilitation project be completed. Total Pr oject Cost: $2,250,000 Status Active

Expenditur es

Total

2022

2023

2024

2025

2026

150,000

150,000

PLANNING/DESIGN CONSTRUCTION

1,500,000

1,500,000

150,000 75,000 75,000 300,000

150,000 75,000 75,000 300,000

INSPECTION

ADMINISTRATION CONTINGENCY

OTHER

150,000

2,100,000

2,250,000

Total

Funding Sour ces FEDERAL GRANTS

Total

2022

2023

2024

2025

2026

1,000,000 1,250,000

1,000,000 1,250,000

GO BONDS-ESSENTIAL PURPOSE

2,250,000

2,250,000

Total

Budget Impact/Other The project will lower operating costs due to the replacement of aging infrastructure. The reduction in operating expenditures is estimated to be less than $10,000 per year.