2022-2026 Capital Improvement Program.pdf
Department
Project # Priority
Total
2022
2023 2024 2025 2026
PUBLIC WORKS
Annual Stormwater Improvements Annual Traffic Signal Projects
1 1 1 1 1 1 1 1 1
240,000 200,000 15,000 100,000 188,082 150,000 250,000 750,000
240,000 200,000 15,000 100,000 188,082 150,000 250,000 750,000
240,000 200,000 15,000 100,000 188,082 150,000 250,000 750,000
240,000 200,000 15,000 100,000 188,082 150,000 250,000 750,000
M3631 S3814 S3816 S3822 S3824 S3826 S3827 S3910 V3101
960,000
300,000 50,000 100,000 188,082 150,000 250,000 750,000
1,100,000
Traffic Calming Curb Ramps-ADA
110,000 500,000
Annual Pavement Rehabilitation Underground Electrical Facilities Bicycle Master Plan Implementation Annual Bridge Maintenance & Repair Annual Sewer Main Replacement
2,107,388 2,107,388 2,107,388 2,107,388 2,107,388
10,536,940
940,410 750,000
1,250,000 3,750,000
19,897,350
3,895,470 4,000,470 4,000,470 4,000,470 4,000,470
PUBLIC WORKS Total
This is an annual project that will repair and/or improve storm water infrastructure throughout the City. M3631 Annual Stormwater Improvements
This is an annual project to replace or add traffic signals at intersections with outdated traffic signal equipment or at dangerous and uncontrolled intersections. This project will install pan/tilt/zoom (PTZ) cameras at signalized intersections that do not currently have PTZ cameras (approximately 57 intersections) in 2022. S3814 Annual Traffic Signal Projects
Annual appropriation for traffic calming projects S3816 Traffic Calming
Annual appropriation for the construction of ADA accessible curb ramps. S3822 Curb Ramps-ADA
Annual appropriation for resurfacing roadways and alleys including asphalt, concrete, and brick. S3824 Annual Pavement Rehabilitation
This is an annual project to convert overhead electrical systems to underground. Dubuque Street, Riverside Drive, and Gilbert Street are currently the priority corridors for undergrounding electrical facilities. S3826 Underground Electrical Facilities
S3827 Bicycle Master Plan Implementation
This is an annual project to implement the recommendations of the bicycle master plan. Improvement projects include construction of bike lanes, bike boulevards, and other features that will improve streets to promote equal access and usability for all modes of transportation. Projects also fund the conversion of 4-lane roads into 3-lane roads in certain areas that are highly used by all of the various modes of transportation.Projects are scheduled as follows: 2022 - Keokuk 4 to 3 lane conversion; Gilbert 4 to 3 lane conversion, south of highway 6; Southgate Bike Lanes (Gilbert to Keokuk; Wetherby Bicycle Boulevard (Lakeside, Sandusky, Taylor, Wetherby); Hollywood Bike Bike Blvd; Lakeside Bicycle Blvd; 2023 - Sunset Bike Lanes (Benton to Highway 1); Oakcrest Bike Blvd; Emerald Bike Blvd; Arlington Bicycle Blvd; 2024 - Dover /Westminster Bike Blvd; Highland Bicycle Blvd; 2025 - Church Street Bicycle Blvd; Broadway Bike Lanes (Sandusky to Highway 6); Ridge/Broadway Bike Blvd; 2026 - Washington Street Bike Blvd (Scott Blvd to 1st Avenue); River Bike Blvd; Woolf Bike Blvd; Newton Marked Route This provides for the biennial inspection and preservation of Iowa City's bridges including major repairs and restoration. 2019 funding for this project was moved to the 2nd Avenue Bridge Replacement project. S3910 Annual Bridge Maintenance & Repair
This project consists of annual sanitary sewer repairs and preventive maintenance throughout the sewer system. V3101 Annual Sewer Main Replacement
532