FY2022

Contact Ben Clark Department PUBLIC WORKS

M3633

Project #

Project Name North Westminster Storm Sewer Upgrades

Type One Phase

Useful Life 50 years

GRANTEE NONE

PLAN None

Category Storm Water

MATCH % NONE

TIF DISTRICT None

Priority Essential (2)

Description This project will increase the storm sewer capacity on North Westminster Drive and Washington Street. Total Project Cost: $1,400,000

Status Active

Justification The North Westminder Drainage Area was studied in response to reported flash flooding near the intersection of North Westminster Street and Washington Street. The study confirmed that sections of the storm sewer system are inadequate to convey runoff for the City’s current 5-year design storm criteria. Surface flooding at these two locations can be deep enough to cover the width of the roadway, overtop the curb and flow on to adjacent properties, creating a potential for property damage and a public safety concern for vehicles.

Expenditures

Total

2021

2022

2023

2024

2025

PLANNING/DESIGN CONSTRUCTION

150,000

150,000

1,000,000

1,000,000

INSPECTION

100,000

100,000

ADMINISTRATION CONTINGENCY

50,000

50,000

100,000

100,000

150,000

1,250,000

1,400,000

Total

Funding Sources STORM WATER FUND

Total

2021

2022

2023

2024

2025

150,000

1,250,000

1,400,000

150,000

1,250,000

1,400,000

Total

Budget Impact/Other Replacing infrastructure will lower the City's operating expenditures through decreased maintenance costs. The estimated decrease in operating expenses is less than $10,000 per year.

553