FY2022
Contact Tim Wilkey Department PUBLIC WORKS
V3153
Project #
Project Name Influent Rake and Screen Replacement
Type One Phase
Useful Life 20 years
GRANTEE NONE
PLAN None
Category Wastewater Treatment
MATCH % NONE
TIF DISTRICT None
Priority Critical (1)
Description This project will replace the existing rake and screens that were installed in the 2002 project and have virtually been in constant operation since installation. The west rake and screen suffered a catastrophic failure in 2017 with the failure of the rake mechanism. This same mechanism has failed again and current repairs cost are unknown. Justification The equipment is nearing the end if its useful life and has already had two catastrophic failure. This equipment catches floating materials that are not biodegradable in the treatment process and will cause blockages causing and additional maintenance to pumps and grinders. This is considered critical for the operation of the treatment plant. Total Project Cost: $1,000,000 Status Active
Expenditures CONSTRUCTION
Total
2021
2022
2023
2024
2025
1,000,000
1,000,000
1,000,000
1,000,000
Total
Funding Sources WASTEWATER FUND
Total
2021
2022
2023
2024
2025
1,000,000
1,000,000
1,000,000
1,000,000
Total
Budget Impact/Other This project will reduce operating and maintenance cost through the rehabilitation of older equipment. The annual savings is less than $10,000 per year.
Contact Tim Wilkey Department PUBLIC WORKS
V3154
Project #
Project Name Hawkeye Lift Station Rehabilitation
Type One Phase
Useful Life 20 years
GRANTEE NONE
PLAN None
Category Wastewater Treatment
MATCH % NONE
TIF DISTRICT None
Priority Essential (2)
Description Rehabilitation includes demolishing the existing building, converting the station to a wet-well valve vault with surface hatches for pump access, basket screening, new standby generator, replace 20 year old pump, new controls, valve vault with bypass capacity, new security fence, landscaping and access road improvements. The station would be plumbed for future expansion, but would not include additional pumps. Justification Hawkeye lift station is 50 years old with an aging building, a generator that can no longer be serviced, a deep drywell requiring an elevator and an existing pump that is 20 years old and a replacement pump only 2 years old. Major portions of the station have outlived their useful life and need replacement. Total Project Cost: $1,025,000 Status Active
Expenditures
Total
2021
2022
2023
2024
2025
PLANNING/DESIGN CONSTRUCTION
25,000
25,000
1,000,000
1,000,000
25,000
1,000,000
1,025,000
Total
Funding Sources WASTEWATER FUND
Total
2021
2022
2023
2024
2025
1,025,000
1,025,000
1,025,000
1,025,000
Total
Budget Impact/Other This project will reduce operating and maintenance cost through the rehabilitation of older equipment. The annual savings is less than $10,000 per year.