FY2022
Contact Tim Wilkey Department PUBLIC WORKS
V3163
Project #
Project Name Aeration Basin Electric & Instrument Improvements
Type One Phase
Useful Life 40 Years
GRANTEE NONE
PLAN None
Category Wastewater Treatment
MATCH % NONE
TIF DISTRICT None
Priority Efficiency Improvement (3)
Description Install cable tray and hanger system along the aeration basin walkways to move the existing wiring/conduits from the hand rails and provide for future expansion Justification Existing power and instrument wiring/conduits are currently placed on the hand rails. The hand rails were not designed to carry the extra weight of the current and future wiring/conduits that will be required to supply/support the operation of the aeration basins. The cable tray and hanger system will move existing conduits and wiring from the handrails and allow for future expansion of power and control wiring. Total Project Cost: $300,000 Status Active
Expenditures
Total
2021
2022
2023
2024
2025
PLANNING/DESIGN CONSTRUCTION
10,000
10,000
259,000
259,000
INSPECTION
2,000
2,000
ADMINISTRATION CONTINGENCY
2,000
2,000
27,000
27,000
300,000
300,000
Total
Funding Sources WASTEWATER FUND
Total
2021
2022
2023
2024
2025
300,000
300,000
300,000
300,000
Total
Budget Impact/Other These projects should lower operating expenditures through the replacement of aging infrastructure. The estimated annual savings is less than $10,000 per year.