FY2022

Contact Tim Wilkey Department PUBLIC WORKS

V3164

Project #

Project Name Return Activated Sludge Pump Replacement

Type Multi-Phase

Useful Life 20 years

GRANTEE NONE

PLAN None

Category Wastewater Treatment

MATCH % NONE

TIF DISTRICT None

Priority Essential (2)

Description The project would include the replacement of return activated sludge pumps. This includes all pumps and any piping/structural modifications required to fit the pumps. Justification These pumps have been in service since 2002 and are nearing the end of their useful working life. The maintenance repair frequency for these pumps has been increasing in the past year. Failure to replace these pumps in a timely manner could cause diminished operation and treatment of the wastewater resulting in violations of our NPDES discharge permit. Total Project Cost: $870,000 Status Active

Future

Expenditures

Total

2021

2022

2023

2024

2025

PLANNING/DESIGN CONSTRUCTION

370,000

5,000

5,000

448,000

448,000

Total

INSPECTION

1,000

1,000

ADMINISTRATION CONTINGENCY

1,000

1,000

45,000

45,000

500,000

500,000

Total

Future

Funding Sources WASTEWATER FUND

Total

2021

2022

2023

2024

2025

370,000

500,000

500,000

500,000

500,000

Total

Total

Budget Impact/Other New pumps would increase pump efficiency, but lower energy consumption and maintenance costs. The estimated reduction in operating expenditures is less than $10,000 per year.