FY2022
City of Iowa City Capital Improvement Program Unfunded Projects
Project Name
Description
Unfunded Amt
71 RIVERSIDE DRIVE & ARTS CAMPUS STORM SEWER
This will be a joint project with the University of Iowa to upgrade the Riverside Drive / Arts Campus storm sewer and lift station to perform better during future floods.
$1,000,000
8 - Parks & Recreation 72 RECREATION / AQUATIC CENTER
As recommended in the Parks and Recreation Master Plan, construct a major new Recreation & Aquatic Center, probably in the western part of Iowa City. This project would include the replacement of the two pool bulkheads, deck tile, dive stands, and the renovation of the women's locker room from a shared shower space to two separate shower spaces. This project is to add a boat ramp to access the Iowa River in the northeast corner of Waterworks Park. Improvements include a boat ramp, boat trailer parking, a boat dock, and an access road. Phase 4 of the Riverfront Crossings Park master plan adds a new river access, an amphitheater, a kayak launch, and new river trails. Construction of second restroom/shelter by Nature Play and second bridge to 2nd Street; also includes removing an abandoned trunk sewer line. Addition of an accessible boat access to the Iowa River from the parking lot at the Park Maintenance Shop. This project will extend the Iowa River Trail from Benton St to Highway 6, on the west side of the Iowa River. Future phases of the trail could extend to Stergis Ferry Park and on top of the west side levee to McCollister Blvd. This project would reconfigure ball diamond #4 at Mercer Park to realign the field to a NW orientation. This would include the removal of the existing field, fencing, and spectator areas. Replace playground #1 at Kickers Athletic Complex as it is reaching the end of projected serviceable life. Project also adds ADA compliant paths. Replace playground at North Market Square Park. This includes replacing rubber mat surface with engineered wood fiber. Adjacent elementary school playground has poured in place surfacing. Replace playground at Reno Street Park. Add ADA compliant paths, park furnishings and fence to community garden. Replace the playground at Calder Park. Site constraints keep this as a smaller piece of equipment. Provides for additional parking on the north side of the Ashton House to support larger events at the facility. Implement changes to make the park more resilient to flooding. Follows from the 2015 master plan.
$16,000,000
73 MERCER PARK POOL IMPROVEMENTS
$500,000
73 WATERWORKS PARK BOAT RAMP
$250,000
74 RIVERFRONT CROSSINGS PARK - PHASE 4 75 RIVERFRONT CROSSINGS PARK RESTROOM & BRIDGE 76 GILBERT STREET/PARK MAINT SHOP BOAT RAMP 77 IOWA RIVER TRAIL, BENTON TO HIGHWAY 6
$1,353,000
$910,000
$245,000
$1,700,000
78 SAND PRARIE ENHANCEMENT Take steps to clear, re-seed and perform low impact development on the 38 acre sand prairie and adjacent McCollister property acquired in 2004/05.
$273,000
79 MERCER PARK BALL DIAMOND #4 RENOVATION 80 KICKER'S PARK PLAYGROUND REPLACEMENT
$374,000
$185,000
81 N. MARKET SQUARE
$350,000
PLAYGROUND REPLACEMENT
82 RENO STREET PARK RENOVATIONS
$240,000
83 CALDER PARK PLAYGROUND REPLACEMENT 84 SECOND PARKING LOT AT ASHTON HOUSE 85 LOWER CITY PARK MASTER PLAN IMPROVEMENTS
$135,000
$300,000
$23,268,522
615
Made with FlippingBook flipbook maker