FY2022
City of Iowa City Capital Improvement Program Unfunded Projects
Project Name
Description
Unfunded Amt
86 EAST SIDE SPORTS COMPLEX IMPROVEMENTS
$14,034,794
Build out of a new 73 acre park on the City’s east side. The park includes expansion of various field sports as well as serves as a neighborhood amenity. Follows from the 2015 master plan. Expansion of the parking areas with addition of 100 parking spaces at the Terry Trueblood Recreation Area lodge and lake.
87 TERRY TRUEBLOOD
$225,000
RECREATION AREA PARKING EXPANSION
9 - Other Projects 88 BURLINGTON STREET MEDIAN Construct the Burlington Street median from Gilbert Street to
$1,973,000
Madison Street. Project includes relocation of water and sewer utilities. This project will require a traffic signal preemption system. (Part of the Riverfront Crossings amendment to City-University URA). Relocate and expand / modernize City Hall and City Council Chambers. Construction of a permanent evidence storage facility.
89 CEMETERY COLUMBARIUM Construction of a columbarium.
$405,000
90 CITY HALL RELOCATION
$12,000,000
91 POLICE EVIDENCE STORAGE FACILITY 92 CENTRAL POLICE STATION RELOCATION
$929,000
Relocate and expand / modernize Central Police Station.
$19,000,000
93 FIRE STATION #1 RELOCATION Relocate and expand / modernize Central Fire Station #1.
$11,593,000 $2,898,000 $2,898,000
94 FIRE STATION #5 95 FIRE STATION #6
Construction of Fire Station #5 in the South Planning District. Construction of Fire Station #6 in the Southwest Planning District. This project will provide funds for the purchase of houses in designated flood hazard buyout areas after FEMA and CDBG buyout programs have ended. This project includes methane abatement, excavation, and fill at the 7 acre site owned by the City at Riverside Dr. and Hwy 6. This site preparation would allow for marketing of this property for commercial development. Snow removal equipment was previously stored in United Hangar. Equipment Shelter would provide enclosed storage for equipment. South General Aviation area site development with access roadway and utilities. Hangar A door replacement; hangar A has 10 doors to be replaced. Streetscape and intersection elements through Summit Street Historic District. This project will install a city-wide Geographic Information System based traffic signal pre-emption system for emergency vehicles. This system is necessary if the Burlington St Median Project is constructed between Madison St and Gilbert St.
96 FLOOD BUYOUTS
$530,000
97 RIVERSIDE DRIVE REDEVELOPMENT
$2,527,000
98 AIRPORT EQUIPMENT SHELTER
$337,500
99 AIRPORT PERIMETER ROAD Construction perimeter road for maintenance and fueling vehicles to travel to south development area.
$267,700
100 SOUTH AIRPORT SITE DEVELOPMENT 101 HANGAR A DOOR REPLACEMENT 102 SUMMIT STREET HISTORIC PLAN 103 TRAFFIC SIGNAL PRE-EMPTION SYSTEM
$2,125,100
$200,000
$302,000
$1,221,000
616
Made with FlippingBook flipbook maker