FY2023 Adopted Budget

PUBLIC WORKS

Department

V3163

Project #

Tim Wilkey

Contact

Project Name Aeration Basin Electric & Instrument Improvements

One Phase

Type

40 Years

Useful Life

GRANTEE NONE

PLAN None

Wastewater Treatment

Category

MATCH % NONE

TIF DISTRICT None

Efficiency Improvement (3)

Priority

Description Install cable tray and hanger system along the aeration basin walkways to move the existing wiring/conduits from the hand rails and provide for future expansion Justification Existing power and instrument wiring/conduits are currently placed on the hand rails. The hand rails were not designed to carry the extra weight of the current and future wiring/conduits that will be required to supply/support the operation of the aeration basins. The cable tray and hanger system will move existing conduits and wiring from the handrails and allow for future expansion of power and control wiring. Total Project Cost: $300,000 Status Active

Expenditures

Total

2022

2023

2024

2025

2026

PLANNING/DESIGN

10,000

10,000

CONSTRUCTION

259,000

259,000

INSPECTION

2,000

2,000

ADMINISTRATION

2,000

2,000

CONTINGENCY

27,000

27,000

300,000

300,000

Total

Funding Sources

Total

2022

2023

2024

2025

2026

WASTEWATER FUND

300,000

300,000

300,000

300,000

Total

Budget Impact/Other These projects should lower operating expenditures through the replacement of aging infrastructure. The estimated annual savings is less than $10,000 per year.

612