FY2023 Adopted Budget
PUBLIC WORKS
Department
V3165
Project #
Tim Wilkey
Contact
Project Name Replacement of Influent Pump Station Pumps
One Phase
Type
20 years
Useful Life
GRANTEE NONE
PLAN None
Wastewater Treatment
Category
MATCH % NONE
TIF DISTRICT None
Essential (2)
Priority
Description Replacement of the influent pump station pumps 1301A, 1302A, and 1303A and any piping/electrical modifications that will be required. Total Project Cost: $605,000 Status Justification There are 6 influent pumps currently installed. The three discussed above were installed in 2002 and are nearing the end of their design life. These pumps have had significant repairs over the past 5 years but those repairs have not extended their design life. These pumps are close coupled centrifugal style pumps and will be replaced with dry pit submersible pumps to match the existing style of the three remaining pumps. There will be piping modifications, upgrading of controls and includes installation. The current pumps are rated at 10 milllion gallons per day (MGD), the newer pumps will be 12 MGD. Active
Expenditures
Total
2022
2023
2024
2025
2026
PLANNING/DESIGN
25,000
25,000
CONSTRUCTION
521,000
521,000
INSPECTION
4,000
4,000
ADMINISTRATION
2,000
2,000
CONTINGENCY
53,000
53,000
605,000
605,000
Total
Funding Sources
Total
2022
2023
2024
2025
2026
WASTEWATER FUND
605,000
605,000
605,000
605,000
Total
Budget Impact/Other The existing pumps have increasing maintenance cost and operation costs when they are OOS. New pumps will improve pump efficiency, lower power cost and reduced maintenance cost. The estimated reduction in operating expenditures is less than $10,000 per year.