FY2023 Adopted Budget
PUBLIC WORKS
Department
V3175
Project #
Tim Wilkey
Contact
Project Name Influent Flow Monitoring
One Phase
Type
20 years
Useful Life
GRANTEE NONE
PLAN None
Wastewater Treatment
Category
MATCH % NONE
TIF DISTRICT None
Critical (1)
Priority
Description Place Parshall flume(s) directly downstream of the grit tank channel isolation valves including ultrasonic measuring. This will require channel modifications, flume and sensor installation and programming into the headworks PLC. Justification Flow measuring was changed from a Parshall flume to an in-channel area velocity sensor/meter in the last plant upgrade. That sensor/meter failed and subsequent efforts at flow measurement lack staff confidence in being greater than 80% accurate. Parshall flumes have been used in the wastewater industry for decades with 99+% accuracy and confidence. Total Project Cost: $251,000 Status Active
Expenditures
Total
2022
2023
2024
2025
2026
PLANNING/DESIGN
25,000
25,000
CONSTRUCTION
200,000
200,000
INSPECTION
4,000
4,000
ADMINISTRATION
2,000
2,000
CONTINGENCY
20,000
20,000
251,000
251,000
Total
Funding Sources
Total
2022
2023
2024
2025
2026
WASTEWATER FUND
251,000
251,000
251,000
251,000
Total
Budget Impact/Other This project will reduce operating and maintenance cost through the rehabilitation of older equipment. The annual savings is less than $10,000 per year.
621