FY2023 Adopted Budget

PUBLIC WORKS

Department

W3322

Project #

Jonathan Durst

Contact

Project Name Collector Well #2 Cleaning and Upgrade

One Phase

Type

70 years

Useful Life

GRANTEE NONE

PLAN None

Water Operations

Category

MATCH % NONE

TIF DISTRICT None

Critical (1)

Priority

Description Clean and cap portions on the existing laterals of Collector Well #2 and install new 12-inch laterals to increase the production capacity of this raw water well. Justification Collector Well #2 has degraded specific capacity (amount of water yield per foot of well height) and will continue to decline as the pore spaces in the surrounding geologic formations plug with fines. Therefore to maintain the usefulness of this high quality water source and to increase its yield capacity lateral cleaning and lateral installation are necessary. Total Project Cost: $1,000,000 Status Active

Expenditures

Total

2022

2023

2024

2025

2026

PLANNING/DESIGN

100,000

100,000

CONSTRUCTION

900,000

900,000

100,000

900,000

1,000,000

Total

Funding Sources

Total

2022

2023

2024

2025

2026

WATER FUND

100,000

900,000

1,000,000

100,000

900,000

1,000,000

Total

Budget Impact/Other

PUBLIC WORKS

Department

W3323

Project #

Jonathan Durst

Contact

Project Name Water Distribution Asset Inventory

One Phase

Type

10 years

Useful Life

GRANTEE NONE

PLAN None

Water Operations

Category

MATCH % NONE

TIF DISTRICT None

Essential (2)

Priority

Description Locate with survey grade accuracy all hydrants, valves, tanks, and other above ground accessible water distribution appertenances and deliver in a geographic information system geometric network with associated metadata for asset management functions. Justification Asset management requires an accurate asset inventory to reliably know the number, location, and information regarding above and below ground assets. The budget provided is based on an $18 per structure cost with about 10,000 structures (hydrants, valves, etc.). Total Project Cost: $250,000 Status Active

Expenditures

Total

2022

2023

2024

2025

2026

PLANNING/DESIGN

20,000

20,000

CONSTRUCTION

230,000

230,000

250,000

250,000

Total

Funding Sources

Total

2022

2023

2024

2025

2026

WATER FUND

250,000

250,000

250,000

250,000

Total

Budget Impact/Other This project will have a negligible impact on the operating budget.

634

Made with FlippingBook - Online Brochure Maker