FY2023 Adopted Budget

PUBLIC WORKS

Department

W3324

Project #

Jonathan Durst

Contact

Project Name Water Plant HVAC Study

One Phase

Type

10 years

Useful Life

GRANTEE NONE

PLAN None

Water Operations

Category

MATCH % NONE

TIF DISTRICT None

Efficiency Improvement (3)

Priority

Description Evaluate and make recommendations to include cost estimates for the removal, repair, and upgrade of environmental systems at the Water Treatment Facility. [Would precede unfunded project #75] Justification The Water Treatment Facility was originally designed to have a heated process area and basement storage. Heating the building in the winter or cooling in the summer is not practical with the existing systems due to the volume of water passing through the processes. Providing for this is not the intent of the project but to remove unused dilapidated systems and to improve existing air handing to better conform to reality. Additionally the administrative spaces suffer from humidity intrusion and malfunctioning controls due to improperly situated and sized equipment, and obsolete building controls systems. Total Project Cost: $75,000 Status Active

Expenditures

Total

2022

2023

2024

2025

2026

PLANNING/DESIGN

75,000

75,000

75,000

75,000

Total

Funding Sources

Total

2022

2023

2024

2025

2026

WATER FUND

75,000

75,000

75,000

75,000

Total

Budget Impact/Other The impact to the operating budget is negligible.

PUBLIC WORKS

Department

W3325

Project #

Jonathan Durst

Contact

Project Name Roof Replacements

One Phase

Type

20 years

Useful Life

GRANTEE NONE

PLAN None

Water Operations

Category

MATCH % NONE

TIF DISTRICT None

Essential (2)

Priority

Description Replace the roofs on the Water Plant garage, chemical storage rooms, 5 collector wells, 3 deep wells, and emergency generator building. Total Project Cost: $900,000 Status Justification The existing roofs are showing signs of failure due to age. The roof material is degrading causing leaks inside the buildings. The roofs will need replacement. Active

Future

Expenditures

Total

2022

2023

2024

2025

2026

800,000

PLANNING/DESIGN

100,000

100,000

100,000

100,000

Total

Total

Future

Funding Sources

Total

2022

2023

2024

2025

2026

800,000

WATER FUND

100,000

100,000

100,000

100,000

Total

Total

Budget Impact/Other The operating impact of these improvements will be negligible.

635