Project #
Useful Life 20 years
Project Name Napoleon Lift Station Improvements
Category Wastewater Treatment
Priority Critical (1)
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Status Active
Description Rehabilitate selected equipment at the Napoleon Lift Station including the bar screen crawler assemblies with electric drive units, provide screening washer compactors, role off, air handling system and rebuilding of the NPPS Pumps #1 and #6 pumping assembly’s and replacing associated electrical or mechanical appurtenances as necessary. Total Project Cost: $2,825,000
Justification Napoleon lift station was constructed in 2000 and is the primary lift station for approximately 2/3 of the wastewater flow to the WWTP. The Bar screen crawler, pumps #1 and #6 and air handling system have operated consistently since its coming into operations and show wear and tear consistent with 20 years of operations and are nearing the end of their useful design life. Improvements in crawler, adding a washer/compactor with roll off, and pump design will offer operation and efficiency improvements.
Expenditures
Total
2023
2024
2025
2026
2027
325,000
325,000
PLANNING/DESIGN CONSTRUCTION
2,237,000
2,237,000
33,000 14,000 216,000
33,000 14,000 216,000
INSPECTION
ADMINISTRATION CONTINGENCY
325,000
2,500,000
2,825,000
Total
Funding Sources WASTEWATER FUND
Total
2023
2024
2025
2026
2027
325,000 325,000
2,500,000 2,500,000
2,825,000 2,825,000
Total
Budget Impact/Other Napoleon Lift Station is the City's primary lift station conveying 2/3 of the daily total flow to the WWTP. If any of this equipment were to fail it would limit the operation of the lift station until repairs could be made.