FY2024 Proposed Budget
Capital Improvement Plan 2023-2027 City of Iowa City, Iowa
2023 2027 thru
Department PUBLIC WORKS
Contact Tim Wilkey
Type Multi-Phase
V3170
Project #
Useful Life 40 Years
Project Name WWTP Roof Replacements
Category Wastewater Treatment
Priority Critical (1)
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Status Active
Description Replace rooves on the following buildings: IPS, SABS, SSPUS, SSPRS, SDSB, SSDA1, SSDS2 and the gas house. This project was originally to start in 2022 but delays in the building roof evaluations, we proposed to move this to start in 2023. Total Project Cost: $747,000
Justification These roofs were identified by City staff as being deficient. The bulk of these buildings are part of the original WWTP project from 1988 with the others from the 2000 project. They have outlived any warranty’s given at the time of construction and are in need of replacement.
Prior
Expenditures
Total
2023
2024
2025
2026
2027
20,000 278,000 10,000 10,000 32,000 350,000
20,000 375,000 10,000 10,000 32,000 447,000
300,000
PLANNING/DESIGN CONSTRUCTION
97,000
Total
INSPECTION
ADMINISTRATION CONTINGENCY
97,000
Total
Prior
Funding Sources WASTEWATER FUND
Total
2023
2024
2025
2026
2027
97,000 97,000
350,000 350,000
447,000 447,000
300,000
Total
Total
Budget Impact/Other These roof's cover multiple buildings with critical infrastructure in them. Should any building suffer water damage that impedes the division staff from performing their job function or causes equipment failure, that could cause the WWTP to not meet its NPDES permit required discharge limits and put the City in environmental liability.