Type One Phase
V3172
Project #
Useful Life 20 years
Project Name Highlander Lift Station Improvements
Category Wastewater Treatment
Priority Essential (2)
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Status Active
Total Project Cost: $204,000
Description Replace and rehabilitate the pumps, power and electrical controls, and mechanical appurtenances.
Justification The Highlander lift station has been in place since 1984 with a one original pump and one replacement pump(2018), mostly original controls and mechanical appurtenances. The area serviced by the lift station has grown considerably and is projected to continue to grow with the installed pumps nearing their max pumping capacity. The project includes replacing the pump with an upsized capacity, change out the controls for PLC/ VFD's , replace all mechanical equipment and install a standby genset. The 2018 pump will be repurposed.
Expenditures
Total
2023
2024
2025
2026
2027
20,000 160,000
20,000 160,000
PLANNING/DESIGN CONSTRUCTION
2,000 2,000
2,000 2,000
INSPECTION
ADMINISTRATION CONTINGENCY
20,000 204,000
20,000 204,000
Total
Funding Sources WASTEWATER FUND
Total
2023
2024
2025
2026
2027
204,000 204,000
204,000 204,000
Total
Budget Impact/Other The Highlander Lift Station is the farthest outlying station in the City. It was installed in 1984 with a single pump replacement in 2018. With the past and potential growth in the area, capacity and reliability is becoming an issue. Rebuilding and increasing the pumping capacity will add longevity to the station to meet future needs.