W3314

Project #

Useful Life 20 years

Project Name High Service Pump VFD Replacement

Category Water Operations

Priority Essential (2)

MATCH % NONE GRANTEE NONE

TIF DISTRICT None PLAN None

Status Active

Total Project Cost: $650,000

Description Replace the (4) four variable frequency drives (VFDs) on our high service pumps.

Justification The VFD's servicing our high service pumps will have been in operation for approximately 21 years when this project reaches construction. This is a typical life span for VFD's. The VFD's have begun to show signs of deterioration with the loss of communications due to worn electronics components and the new SCADA system was modified to accommodate the out-moded communications protocols utilized by these drives. We anticipate continued and more frequent repair activities as these drives reach the end of their useful life.

Expenditures

Total

2023

2024

2025

2026

2027

50,000

50,000 600,000 650,000

PLANNING/DESIGN CONSTRUCTION

600,000 600,000

50,000

Total

Funding Sources

Total

2023

2024

2025

2026

2027

50,000 50,000

600,000 600,000

650,000 650,000

WATER FUND

Total

Budget Impact/Other Potential cost savings derived from decreased power usage, less wear on the pumps, and less repair or reactive maintenance.