FY2024 Proposed Budget
Capital Improvement Plan 2023-2027 City of Iowa City, Iowa
2023 2027 thru
Department PUBLIC WORKS
Contact Jonathan Durst
Type One Phase
W3328
Project #
Useful Life 70 years
Project Name Powerhouse Dam Rehabilitation
Category Water Operations
Priority Critical (1)
MATCH % GRANTEE
TIF DISTRICT PLAN
Status Active
Description Repair defects found during an underwater inspection of the Iowa River powerhouse dam located below the pedestrian bridge connecting the Iowa River Power Restaurant to the Peninsula Well Field area. Total Project Cost: $225,000
Justification The powerhouse dam maintains the Iowa River elevation in the tract extending from the Coralville Dam to the powerhouse dam. This pool elevation directly impacts the production of the water treatment facility collector wells #1 and #2 by providing hydrostatic pressure above the well laterals. The dam's failure would also negatively impact the pedestrian bridge and other surrounding infrastructure. The inspection work has been completed. The repair design and construction remain.
Expenditures CONSTRUCTION
Total
2023
2024
2025
2026
2027
225,000 225,000
225,000 225,000
Total
Funding Sources
Total
2023
2024
2025
2026
2027
225,000 225,000
225,000 225,000
WATER FUND
Total
Budget Impact/Other This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
639