FY2024 Proposed Budget
Capital Improvement Plan 2023-2027 City of Iowa City, Iowa
2023 2027 thru
Department PUBLIC WORKS
Contact Jonathan Durst
Type One Phase
W3329
Project #
Useful Life 20 years
Project Name GSR Upgrade and Repairs
Category Water Operations
Priority Critical (1)
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Status Active
Description Replace and elevate rotting electrical panels in the Rochester (ROC), Emerald (EME), and Sycamore (SYC) ground storage reservoirs (GSR). Make repairs to the pump house structures, roofs, and replace doors. Evaluate the addition of a third pump to ROC or EME. Add a third pump to application GSR. Total Project Cost: $800,000
Justification The City's drinking water system is controlled by the operation of pumps at the treatment facility and GSRs. These GSRs have been in operation since the 1970's operating 24 hours-a-day. With the creation of the east pressure zone and the continued development to the west it is imperative to keep the ROC and EME GSR's capable of being water pressure generators by improving their pumpage and electrical systems. The SYC GSR is in need of electrical and building repairs.
Expenditures
Total
2023
2024
2025
2026
2027
80,000 720,000 800,000
80,000 720,000 800,000
PLANNING/DESIGN CONSTRUCTION
Total
Funding Sources
Total
2023
2024
2025
2026
2027
800,000 800,000
800,000 800,000
WATER FUND
Total
Budget Impact/Other This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
640
Made with FlippingBook Learn more on our blog