Capital Improvement Plan 2024-2028 City of Iowa City, Iowa
PUBLIC WORKS
Department
Contact Jonathan Durst
One Phase
Type
W3330
Project #
30 Years
Useful Life
Project Name Water Plant Flowemeter Replacement
Water Operations
Category
GRANTEE NONE
PLAN None
Critical (1)
Priority
MATCH % NONE
TIF DISTRICT None
Active
Status
Total Project Cost: $550,000
Description Part of Unfunded Project #84. Replacement of (1) 12-inch, (2) 20-inch, (3) 30-inch, and (2) 36-inch magnetic flow meters at the Water Treatment Plant.
Justification Flow meters are used to control unit operations of the water treatment system. Magnetic flowmeters are currently installed to control the softeners, chlorine contact tanks, and high service pumps to the Emerald, Rochester, and Plant Service Water transmission lines. The existing magnetic flowmeters are at end-of-life and are malfunctioning. Operations and maintenance teams have developed work around to avoid the costly replacements. These work arounds are beginning to fail as well. Therefore replacement is necessary with new equipment more applicable to the application.
Expenditures
Total
2024
2025
2026
2027
2028
PLANNING/DESIGN
50,000
50,000
CONSTRUCTION
500,000
500,000
550,000
550,000
Total
Funding Sources
Total
2024
2025
2026
2027
2028
WATER FUND
550,000
550,000
550,000
550,000
Total
Budget Impact/Other This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.