33 Kimball Road Reconstruction
Reconstruct Kimball road from N. Gilbert Street to N. Governor Street. Project includes 22 foot wide PCC street and a 5 foot wide sidewalk on one side of the street, new 8" DIP water main, new storm sewer, and sanitary service improvements. Landscaping and aesthetic treatments in the Interstate 80 corridor. The objective of this project is to mitigate the visual impact of the addition of a third lane to I-80 and to provide cohesive and pleasing feel to the Iowa City corridor. Obtain consulting services to provide a functional design of Gilbert Street between Hwy 6 & Kirkwood Avenue. The functional design should take into account all previous design work completed for the corridor. This project will reconstruct and elevate Foster Road from No Name Street to Dubuque Road. This project will construct a roundabout at Camp Cardinal Boulevard / Kennedy Parkway. This project is intended for the unfunded list of projects. The extensions of these streets plays an important part in the overall development of the Riverfront Crossings area. It will also imporve access and the traffic cirulation in this area. This project does not include any costs necessary for the property acquisitions. This project will provide landscaping and street/pedestrian lighting on Gilbert Street from College Street to the Gilbert Street Bridge over Ralston Creek This project will reconstruct Washington Street from Madison Street to Clinton Street and will include new street pavement, sidewalk, curb ramps, utility repairs/improvements and other associated work. This project will construct a 5' wide ADA sidewalk on Friendship Street between 5th Ave and 7th Ave This project will construct dedicated left-turn lanes (or a center left-turn lane) on Herbert Hoover Highway at American Pharoah Drive, Hanks Drive and Thunder Gulch Road. This project is intended to be placed on the unfunded list of projects until the pending traffic study is complete. This project generally includes the construction of a raised midblock crosswalk on Lakeside Drive between Aniston Street and Amber Lane at the Sycamore Greenway Trail This project includes the reconstruction of three blocks of brick street along Linn Street from Bloomington Street to Church Street Reconstruction of Park Road from Rocky Shore Drive to the west project limits of the Gateway Project, approximately
$3,480,000
34 Interstate 80 Aesthetic Improvements
$300,000
35 Towncrest Drive Reconstruction A private street that the property owners would dedicate the right of way to the City, and the City will reconstruct. Parking along and adjacent to the right of way will be reconfigured to better facilitate vehicle movement and pedestrian safety.
$600,000
36 Gilbert Street Functional Design - Hwy 6 To Kirkwood
$60,000
37 Foster Road Elevation
$7,800,000
38 Camp Cardinal Blvd / Kennedy Parkway - Roundabout
$2,058,839
39 Kirkwood Ave to Capitol Street Connection
$3,100,000
40 Gilbert Street Lighting & Landscaping Improvments
$975,000
41 Washington Stree Recon - Madison to Clinton
$2,700,000
42 Friendship Sidewlk Infill - 5th Ave to 7th Ave 43 Herbert Hoover Highway - Turn Lanes
$210,000
$6,400,000
44 Lakeside Drive Crosswalk Improvements
$240,000
45 Linn Street Reconstruction
$3,650,000
46 Park Road Reconstruction - Rocky Shore to Riverside
$7,500,000
Riverside Drive. This project will include new street pavement, sidewalk, utility improvements and other associated work.