FY25 Proposed Budget
City of Iowa City Capital Improvement Program Unfunded Projects
Project Name
Description
Unfunded Amt
47 Kitty Lee Road SW Improvements This project is necessary to provide an adequate secondary access for the future Carson Farms and other developments in the area. 48 Ridgewood Lane Reconstruction This project includes complete reconstruction of Ridgewood Lane and a portion of Virginia Drive, as well as water main and storm sewer replacement.
$7,700,000
$700,000
3 - Transportation Services
49 Rock Island Railroad Depot Restoration
Preparation of Old Rock Island Railroad Depot for Amtrak service, including platform construction, lighting, utilities, passenger information display, ticketing kiosks, canopy, warming shelter, signage, parking, and accessibility improvements. To construct façade improvements on the Capitol Street and Dubuque Street parking ramps to improve their aesthetic appearance in these high profile, high traffic areas.
$5,381,000
50 Capitol & Dubuque Street Parking Ramp Façade Improvements
$1,000,000
4 - Ped & Bike Trails
51 Iowa River Trail, Highway 6 To Sturgis Ferry Park
This project will extend the Iowa River Trail from just north of Highway 6 to Sturgis Ferry Park on the west side of the Iowa River.
$1,180,000
52 Iowa River Trail, Gateway Segment Construction of a trail extension adjacent to (east) of the Iowa River between Park Road and the University of Iowa pedestrian bridge.
$500,000
53 Windsor Ridge Trail Extension
The project includes the extension of a 10' wide trail along north Branch of Snyder Creek from Scott Boulevard to American Legion Road. This project will construct an 8' wide sidewalk adjacent to Old Highway 218 between Sturgis Ferry Park and McCollister Boulevard. The project removes the existing Crandic tracks and repurposes the existing corridor for a 10' multi-use trail approximately between Oakdale Boulevard in Coralville to Gilbert Street in Iowa City (approximately 6.1 miles). Iowa City's portion of the project is approximately 1.75 miles. The project will construct sidewalk along the north side of Myrtle Avenue between Greenwood Drive and Olive in order to fill in a gap in the City’s sidewalk network. This project will construct a trail connection along Southgate Avenue from Gilbert Street to the Iowa River Trail. Construct a trail from Willow Creek Drive, under Highway One, around perimeter of airport, to connect with Iowa River Corridor (IRC) Trail. Connect Willow Creek Trail from its current west terminus via a tunnel under Highway 218, to connect with the trail in Hunters Run Park and further west. Addition of a loop trail and connections to the bikeways in the surrounding neighborhood.
$1,200,000
54 Old Highway 218 Trail/Wide Sidewalk
$550,000
55 Crandic Railroad Rails-To-Trails Project
$1,575,000
56 Myrtle Ave Sidewalk Infill
$155,000
57 Southgate Ave Iowa River Trail Connector 58 Willow Creek Trail - Phase Iii
$250,000
$870,000
59 Willow Creek Trail-West
$2,814,000
60 Fairmeadows Trail
$125,000
648
Made with FlippingBook - professional solution for displaying marketing and sales documents online