FY25 Proposed Budget

City of Iowa City Capital Improvement Program Unfunded Projects

Project Name

Description

Unfunded Amt

47 Kitty Lee Road SW Improvements This project is necessary to provide an adequate secondary access for the future Carson Farms and other developments in the area. 48 Ridgewood Lane Reconstruction This project includes complete reconstruction of Ridgewood Lane and a portion of Virginia Drive, as well as water main and storm sewer replacement.

$7,700,000

$700,000

3 - Transportation Services

49 Rock Island Railroad Depot Restoration

Preparation of Old Rock Island Railroad Depot for Amtrak service, including platform construction, lighting, utilities, passenger information display, ticketing kiosks, canopy, warming shelter, signage, parking, and accessibility improvements. To construct façade improvements on the Capitol Street and Dubuque Street parking ramps to improve their aesthetic appearance in these high profile, high traffic areas.

$5,381,000

50 Capitol & Dubuque Street Parking Ramp Façade Improvements

$1,000,000

4 - Ped & Bike Trails

51 Iowa River Trail, Highway 6 To Sturgis Ferry Park

This project will extend the Iowa River Trail from just north of Highway 6 to Sturgis Ferry Park on the west side of the Iowa River.

$1,180,000

52 Iowa River Trail, Gateway Segment Construction of a trail extension adjacent to (east) of the Iowa River between Park Road and the University of Iowa pedestrian bridge.

$500,000

53 Windsor Ridge Trail Extension

The project includes the extension of a 10' wide trail along north Branch of Snyder Creek from Scott Boulevard to American Legion Road. This project will construct an 8' wide sidewalk adjacent to Old Highway 218 between Sturgis Ferry Park and McCollister Boulevard. The project removes the existing Crandic tracks and repurposes the existing corridor for a 10' multi-use trail approximately between Oakdale Boulevard in Coralville to Gilbert Street in Iowa City (approximately 6.1 miles). Iowa City's portion of the project is approximately 1.75 miles. The project will construct sidewalk along the north side of Myrtle Avenue between Greenwood Drive and Olive in order to fill in a gap in the City’s sidewalk network. This project will construct a trail connection along Southgate Avenue from Gilbert Street to the Iowa River Trail. Construct a trail from Willow Creek Drive, under Highway One, around perimeter of airport, to connect with Iowa River Corridor (IRC) Trail. Connect Willow Creek Trail from its current west terminus via a tunnel under Highway 218, to connect with the trail in Hunters Run Park and further west. Addition of a loop trail and connections to the bikeways in the surrounding neighborhood.

$1,200,000

54 Old Highway 218 Trail/Wide Sidewalk

$550,000

55 Crandic Railroad Rails-To-Trails Project

$1,575,000

56 Myrtle Ave Sidewalk Infill

$155,000

57 Southgate Ave Iowa River Trail Connector 58 Willow Creek Trail - Phase Iii

$250,000

$870,000

59 Willow Creek Trail-West

$2,814,000

60 Fairmeadows Trail

$125,000

648