City of Iowa City Capital Improvement Program Unfunded Projects
Project Name
Description
Unfunded Amt
123 Ralston Creek Trail Under Iowa Interstate Railroad
The project would involve constructing a trail connection under the Iowa Interstate Railroad that connects the existing trail along the west side of Ralston Creek, north of the Iowa Interstate Railroad, to the proposed trail that will be constructed along the west side of Ralston Creek as part of a development located south of the Iowa Interstate Railroad. Take steps to clear, re-seed and perform low impact development on the 38 acre sand prairie and adjacent McCollister property acquired in 2004/05. This project would reconfigure ball diamond #4 at Mercer Park to realign the field to a NW orientation. This would include the removal of the existing field, fencing, and Replace playground #1 at Kickers Athletic Complex as it is reaching the end of projected serviceable life. Project also adds ADA compliant paths. Replace the playground at Calder Park. Site constraints keep this as a smaller piece of equipment. Provides for additional parking on the north side of the Ashton House to support larger events at the facility. Implement changes to make the park more resilient to flooding. Follows from the 2015 master plan. Build out of a new 73 acre park on the City’s east side. The park includes expansion of various field sports as well as serves as a neighborhood amenity. Follows from the 2015 master plan. Expansion of the parking areas with addition of 100 parking spaces at the Terry Trueblood Recreation Area lodge and lake. Connect Broadway sidewalks to the trail system in Wetherby Park. Resurface the parking lot and basketball court adjacent to parking lot. A trail extension will also be made to the Community Garden area in order to provide ADA access. Addition of sidewalk along the Benton St right-of-way of Benton Hill Park along with necessary retaining wall elements. Replace the aging playground at Brookland Park with a similar small size playground and swings. Update other site amenities as needed. Post 2021 Recreation Master Plan- moved RALRC pool and HVAC project to FY27, updated costs to replace RALRC existing pool filtration system, add a UV disinfectant system, upgrade deteriorated iron piping under deck, surge tank replacment and add dehumidication HVAC system to bring facility to current building code compliancy for air quality. Replacement of the playground, basketball court surfacing, shelter, and site amenities.
$1,700,000
124 Sand Prairie Enhancement
$273,000
125 Mercer Park Ball Diamond #4 Renovation
$374,000
126 Kicker's Park Playground Replacement
$185,000
127 Calder Park Playground Replacement
$135,000
128 Second Parking Lot At Ashton House 129 Lower City Park Master Plan Improvements 130 East Side Sports Complex Improvements
$300,000
$23,268,522
$14,034,794
131 Terry Trueblood Recreation Area Parking Expansion
$225,000
132 Wetherby Park Entrance And Parking Lot Improvements
$100,000
133 Scott Park Driveway and Parking Replace the chipseal driveway and parking area at Scott Park with a concrete surface and reconfigure the lot to more effeciently serve additional parking
$275,000
134 Benton Hill Park Sidewalk
$175,000
135 Brookland Park Playground
$200,000
136 Robert A. Lee Recreation Center Pool Filter & HVAC
$4,060,000
137 Oak Grove Park Improvements
$300,000