FY25 Proposed Budget

City of Iowa City Capital Improvement Program Unfunded Projects

Project Name

Description

Unfunded Amt

9 - Other Projects

138 Burlington Street Median

Construct the Burlington Street median from Gilbert Street to Madison Street. Project includes relocation of water and sewer utilities. This project will require a traffic signal preemption system. (Part of the Riverfront Crossings amendment to City-University URA).

$1,973,000

139 Cemetery Columbarium 140 City Hall Relocation

Construction of a columbarium.

$405,000

Relocate and expand / modernize City Hall and City Council Chambers.

$12,000,000

141 Police Evidence Storage Facility Construction of a permanent evidence storage facility. 142 Central Police Station Relocation Relocate and expand / modernize Central Police Station.

$929,000

$19,000,000 $11,593,000 $2,898,000 $2,898,000

143 Fire Station #1 Relocation

Relocate and expand / modernize Central Fire Station #1. Construction of Fire Station #5 in the South Planning District. Construction of Fire Station #6 in the Southwest Planning District. This project will provide funds for the purchase of houses in designated flood hazard buyout areas after FEMA and CDBG buyout programs have ended. This project includes methane abatement, excavation, and fill at the 7 acre site owned by the City at Riverside Dr. and Hwy 6. This site preparation would allow for marketing of this property for commercial development. Snow removal equipment was previously stored in United Hangar. Equipment Shelter would provide enclosed storage for equipment. Construction perimeter road for maintenance and fueling vehicles to travel to south development area. South General Aviation area site development with access roadway and utilities. Hangar A door replacement; hangar A has 10 doors to be replaced. Streetscape and intersection elements through Summit Street Historic District.

144 Fire Station #5 145 Fire Station #6

146 Flood Buyouts

$530,000

147 Riverside Drive Redevelopment

$2,527,000

148 Airport Equipment Shelter

$337,500

149 Airport Perimeter Road

$267,700

150 South Airport Site Development

$2,125,100

151 Hangar A Door Replacement

$200,000

152 Summit Street Historic Plan

$302,000

153 Traffic Signal Pre-Emption System This project will install a city-wide Geographic Information System based traffic signal pre-emption system for emergency vehicles. This system is necessary if the Burlington St Median Project is constructed between Madison St and Gilbert St.

$1,221,000

154 Iowa Interstate Railroad Quiet Zones

The Quiet Zones project would be for design and implementation of required upgraded warning devices and physical infrastructure (medians and gates) for four at-grade street crossings. The upgrades would improve safety at each crossing and reduce the need for trains to sound their horns. Modification of the Burlington Street Dam to address public safety concerns, improve riverbank stability, improve fish habitat, and create recreational opportunities.

$1,000,000

155 Burlington Street Dam

$6,435,000

156 Excavator for compost operations This machine would be used primarily in the compost and wood chip facility at the landfill to assist in safely grinding incoming materials.

$280,000