Capital Improvement Plan 2024-2028 City of Iowa City, Iowa

PUBLIC WORKS

Department

Contact Tim Wilkey

Multi-Phase

Type

V3170

Project #

40 Years

Useful Life

Project Name WWTP Roof Replacements

Wastewater Treatment

Category

GRANTEE NONE

PLAN None

Critical (1)

Priority

MATCH % NONE

TIF DISTRICT None

Active

Status

Total Project Cost: $747,000

Description Replace roofs on the following buildings: IPS, SABS, SSPUS, SSPRS, SDSB, SSDA1, SSDS2 and the gas house. This project was originally to start in 2022 but delays in the building roof evaluations, we proposed to move this to start in 2023.

Justification These roofs were identified by City staff as being deficient. The bulk of these buildings are part of the original WWTP project from 1988 with the others from the 2000 project. They have outlived any warranty’s given at the time of construction and are in need of replacement.

Prior

Expenditures

Total

2024

2025

2026

2027

2028

PLANNING/DESIGN

20,000

20,000

397,000

CONSTRUCTION

278,000

278,000

Total

INSPECTION

10,000

10,000

ADMINISTRATION

10,000

10,000

CONTINGENCY

32,000

32,000

350,000

350,000

Total

Prior

Funding Sources

Total

2024

2025

2026

2027

2028

WASTEWATER FUND

350,000

350,000

397,000

350,000

350,000

Total

Total

Budget Impact/Other These roof's cover multiple buildings with critical infrastructure in them. Should any building suffer water damage that impedes the division staff from performing their job function or causes equipment failure, that could cause the WWTP to not meet its NPDES permit required discharge limits and put the City in environmental liability.