2022-2026 Capital Improvement Program.pdf

Contact Tim Wilkey Depar tment PUBLIC WORKS

V3163

Pr oject #

Pr oject Name Aer ation Basin Electr ic & Instr ument Impr ovements

Type One Phase

Useful Life 40 Years

MATCH % NONE GRANTEE NONE

TIF DISTRICT None PLAN None

Pr ior ity Efficiency Improvement (3) Categor y Wastewater Treatment

Description Install cable tray and hanger system along the aeration basin walkways to move the existing wiring/conduits from the hand rails and provide for future expansion Justification Existing power and instrument wiring/conduits are currently placed on the hand rails. The hand rails were not designed to carry the extra weight of the current and future wiring/conduits that will be required to supply/support the operation of the aeration basins. The cable tray and hanger system will move existing conduits and wiring from the handrails and allow for future expansion of power and control wiring. Total Pr oject Cost: $300,000 Status Active

Expenditur es

Total

2022

2023

2024

2025

2026

10,000 259,000

10,000 259,000

PLANNING/DESIGN CONSTRUCTION

2,000 2,000

2,000 2,000

INSPECTION

ADMINISTRATION CONTINGENCY

27,000 300,000

27,000 300,000

Total

Funding Sour ces WASTEWATER FUND

Total

2022

2023

2024

2025

2026

300,000 300,000

300,000 300,000

Total

Budget Impact/Other These projects should lower operating expenditures through the replacement of aging infrastructure. The estimated annual savings is less than $10,000 per year.

612

Made with FlippingBook. PDF to flipbook with ease